Skip to main content

Siemens constructing driverless subway in Riyadh

A consortium of Siemens, US company Bechtel and local construction companies Almabani and Consolidated Contractors Company has been awarded a subway contract worth US$10 billion by the Riyadh High Commission for Urban Development (ArRiyadh Development Authority). Siemens, whose share of the deal is worth around US$2.1 billion, is supplying subway rolling stock, electrification systems and signalling technology for driverless operation, as well as system integration.
October 11, 2013 Read time: 2 mins
A consortium of 189 Siemens, US company Bechtel and local construction companies Almabani and Consolidated Contractors Company has been awarded a subway contract worth US$10 billion by the Riyadh High Commission for Urban Development (ArRiyadh Development Authority).

Siemens, whose share of the deal is worth around US$2.1 billion, is supplying subway rolling stock, electrification systems and signalling technology for driverless operation, as well as system integration.

With a population of five million, the city, which previously relied primarily on diesel buses for its urban transit needs, intends the investment in the six-line, 175 kilometre metro as a step towards modernisation of the traffic infrastructure.

The signalling and train control technology ensures that, particularly during rush-hour periods, trains can operate at 90-second intervals, an operating frequency that enables the system to handle 21,000 passengers per hour. The two lines will be equipped with WLAN-based control system for driverless and conductor-less train operation, as well as automatic train control, radio transmission and 31 electronic interlocking systems. Siemens is also equipping the operations control centre for both lines.

Siemens will also supply the power supply systems, emergency power facilities with diesel generators and uninterruptible power supplies (UPS). The power supply systems use the electrical energy generated by the trains when the brakes are applied, which is fed back into the metro system's power supply and made available for all other electrical loads.

Siemens will also deliver a total of 74 aluminium metro vehicles, designed to run on standard-gauge track at a top speed of 90 km/h.

For more information on companies in this article

Related Content

  • Keys to the Kingdom
    May 1, 2025
    Saudi Arabia is investing heavily in smart infrastructure projects. Zeina Nazer takes a look at them – from Riyadh Metro to the controversial ‘vertical urbanism’ of The Line
  • 2012 US Urban Mobility Report published
    February 8, 2013
    Researchers at the Texas A&M Transportation Institute (TTI) have come up with a way to measure the unreliability of trip times due to traffic congestion. The Planning Time Index (PTI) illustrates the amount of extra time needed to arrive on time for higher priority events, such as an airline departure, just-in-time shipments, medical appointments or especially important social commitments. If the PTI for a particular trip is 3.00, a traveller would allow sixty minutes for a trip that typically takes twenty
  • TEN-T funds modernise French rail line
    December 10, 2012
    A section of French rail network from Mulhouse to Chalampé on the German border has been inaugurated to passenger traffic as part of a European Union supported project. The TEN-T funded project involves a 17.5 km section of French single-track rail infrastructure; the modernised section, supported by US$903,000 of EU funds, will allow faster connections to and from Mülheim in Germany. The project contributes to the TEN-T Priority Project 24 Lyon/Genova-Basel-Duisburg-Rotterdam/Antwerp railway axis, an esse
  • Greater Manchester signs significant new service contract with Siemens
    April 19, 2012
    Greater Manchester Combined Authority with Transport for Greater Manchester have awarded to Siemens one of the most significant service contracts of its kind for the long-term maintenance of traffic signalling equipment across all ten districts of Greater Manchester. Under Transport for Greater Manchester’s guidance, the service contract is designed to secure substantial energy savings and reduce carbon emissions.