Skip to main content

Siemens completes installation of new LED streetlights for US town

Siemens has recently completed installation of more than 550 LED streetlights and floodlights in the Town of Hamilton, Massachusetts, on behalf of Metropolitan Area Planning Council, (MAPC). The full project installation is expected to result in at least US$25,000 in annual energy and maintenance savings for the town, reduce energy usage by 60 per cent compared to existing streetlights, and provide citizens with clearer lighting conditions to improve visibility and safety. The project is also expected t
October 9, 2015 Read time: 2 mins
189 Siemens has recently completed installation of more than 550 LED streetlights and floodlights in the Town of Hamilton, Massachusetts, on behalf of Metropolitan Area Planning Council, (MAPC).

The full project installation is expected to result in at least US$25,000 in annual energy and maintenance savings for the town, reduce energy usage by 60 per cent compared to existing streetlights, and provide citizens with clearer lighting conditions to improve visibility and safety. The project is also expected to be eligible for approximately $27,000 in National Grid energy efficiency incentive funds to help offset project costs.

This agreement allows Siemens to remove the existing streetlights and install the new, more energy efficient LED lights. Siemens will also guarantee the amount of energy savings the town will realise each year for the next ten years. The new LED installations, performed by Siemens electricians, have been carefully selected to provide the appropriate amount of lighting for various locations across the town and focus light directly downward on the sidewalks and roadway.  The fixtures, supplied by Cree, have a ten-year product warranty, but are anticipated to have a much longer life.

Related Content

  • Qatar invests $70 billion to pave the way to world beating transportation
    July 26, 2013
    Eng. Zeina Nazer looks at what Qatar’s recently-announced investment in transport infrastructure will mean on the ground. Qatar is experiencing a rapid economic and industrial growth. This growth is characterised by a rapid population increase and by the urgent need towards the development of both infrastructure projects and major transport projects. In order to handle this rate of development within Qatar, Public Works Authority (Ashghal) is developing a fully-integrated multimodal transportation system in
  • Infrastructure and the autonomous vehicle
    December 12, 2014
    Harold Worrall ponders the effect of autonomous vehicles on transportation infrastructure. For the last century the transportation industry has been focused on the supply of infrastructure to support the ever growing fleet of vehicles and the greater number of miles covered by each vehicle. Our focus has been planning, funding, designing, building and maintaining roadways. Politicians, engineers, planners, financial managers … all of us have had this focus. We have experienced demand growth since the first
  • Transportation hub the centre of sustainable urban development
    November 21, 2012
    A marriage of transit, technology and culture is taking shape in Minneapolis, with ITS systems vital to hopes for a sustainable development centred on a hub of public transportation. Construction started in July this year on ‘The Interchange’ – a station in the Midwest US city of Minneapolis claimed as the most spectacular expression yet of the fast-spreading North American concept of transit-oriented development (TOD). Due for completion in 2014, the Interchange is designed as a multi-modal public transpor
  • Success of London’s congestion charge scheme
    February 15, 2013
    Said to be the biggest congestion charge scheme to launch in any city, the London scheme got off to a smooth start ten years ago on 17 February 2003, much to the surprise of London's then mayor Ken Livingstone, who ten years later says “it turned out better than I expected.” None of the anticipated pre-7am congestion as drivers attempted to avoid the charge happened, and by the end of the first day 57,000 drivers had paid it. The main problem seemed to be that buses were all running ahead of time and had t