Skip to main content

Siemens completes installation of new LED streetlights for US town

Siemens has recently completed installation of more than 550 LED streetlights and floodlights in the Town of Hamilton, Massachusetts, on behalf of Metropolitan Area Planning Council, (MAPC). The full project installation is expected to result in at least US$25,000 in annual energy and maintenance savings for the town, reduce energy usage by 60 per cent compared to existing streetlights, and provide citizens with clearer lighting conditions to improve visibility and safety. The project is also expected t
October 9, 2015 Read time: 2 mins
189 Siemens has recently completed installation of more than 550 LED streetlights and floodlights in the Town of Hamilton, Massachusetts, on behalf of Metropolitan Area Planning Council, (MAPC).

The full project installation is expected to result in at least US$25,000 in annual energy and maintenance savings for the town, reduce energy usage by 60 per cent compared to existing streetlights, and provide citizens with clearer lighting conditions to improve visibility and safety. The project is also expected to be eligible for approximately $27,000 in National Grid energy efficiency incentive funds to help offset project costs.

This agreement allows Siemens to remove the existing streetlights and install the new, more energy efficient LED lights. Siemens will also guarantee the amount of energy savings the town will realise each year for the next ten years. The new LED installations, performed by Siemens electricians, have been carefully selected to provide the appropriate amount of lighting for various locations across the town and focus light directly downward on the sidewalks and roadway.  The fixtures, supplied by Cree, have a ten-year product warranty, but are anticipated to have a much longer life.

For more information on companies in this article

Related Content

  • Big data analytics identifies congestion increases
    November 26, 2014
    Iteris has completed and published the Alameda County Transportation Commission (Alameda CTC) 2014 Level of Service Monitoring Report. The report was generated for speed-based congestion monitoring, utilising big data analytics in place of conventional in-field manual data collection for 205 miles of the 327 mile network. Use of big data analytics will be expanded in future monitoring cycles. Many agencies conduct congestion monitoring through manual data collection efforts. Agencies traditionally us
  • Connected Vehicles test vehicle to vehicle applications
    January 19, 2012
    In the US, the ITS Joint Program Office is about to conduct a series of Driver Clinics intended to gauge public reaction to Connected Vehicle safety technologies and applications. Starting in August, the US Department of Transportation (USDOT) will test Vehicle-to-Vehicle (V2V) applications with everyday drivers in what it describes as 'normal operational scenarios'. These Driver Clinics are being carried out at six locations across the US and together with the subsequent model deployment beginning in 2012,
  • I-80 Smart Corridor sets the ITS standard for California's Bay Area
    March 23, 2015
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al
  • I-80 Smart Corridor sets the ITS standard for California's Bay Area
    March 23, 2015
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al