Skip to main content

Siemens to automate railway network in Algiers metropolitan area

Siemens is to supply the signalling, safety and control systems for the 140 km long-distance rail network in the Algiers metropolitan area. The order will be carried out by Estel RA, a joint venture of state-run Algerian Railways SNTF (Société Nationale des Transports Ferroviaires) and Siemens.
December 23, 2015 Read time: 2 mins

189 Siemens is to supply the signalling, safety and control systems for the 140 km long-distance rail network in the Algiers metropolitan area. The order will be carried out by Estel RA, a joint venture of state-run Algerian Railways SNTF (Société Nationale des Transports Ferroviaires) and Siemens.

With over three million inhabitants, Algiers is the country's largest city and, at the same time, Algeria's most important transport hub. Expanding the railway network is designed to shift traffic from road to rail, thus reducing the daily congestion in the greater Algiers area and improving the mobility of the city's inhabitants.

Network commissioning is planned for the end of 2019. The railway network includes 18 stations and is designed for both goods and passenger transport. It is to be equipped with signalling, safety and control systems, as well as shunting and telecommunications technology. Siemens is supplying the first expansion stage of the ETCS European Train Control System. This permits speeds of up to 160 km/h and enables trains to travel at shorter intervals, thus increasing so-called throughput. Siemens is supplying automated shunting equipment for the freight line which will optimise goods handling with modern cargo technology. In addition, the Algerian rail operator personnel will receive training in how to operate and maintain the new system.

"As rail automation market leaders, we are supplying state-of-the-art technology to Algeria: cross-border rail services at up to 160 km/h for passengers and freight, shorter headways and greater line utilisation", says Jochen Eickholt, CEO of the Mobility Division at Siemens.

For more information on companies in this article

Related Content

  • ITS European Congress expo ‘biggest ever’, says Ertico
    March 28, 2019
    For anybody interested in the latest trends in smart and integrated mobility, June’s ITS European Congress in Brainport-Eindhoven represents an opportunity to share knowledge and learn about the latest technologies and policy developments. That is the message from organiser Ertico – ITS Europe, which adds that the Congress in the Netherlands is expected to attract around 3,000 participants from over 50 countries, and will feature more than 100 sessions and workshops, many demonstrations and technical to
  • Nairobi looks to ITS to ease travel problems
    December 21, 2017
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of adequate traffic management systems and poor utilisation of existing road facilities.
  • TagMaster heavy-duty ID-tags for mainline rail project in China
    April 23, 2012
    Sweden-headquartered RFID specialist TagMaster has received an order from Richor, the company’s premium Chinese distributor, to supply 10,000 Heavy-duty ID-tags. These customised 2.45 GHz ID-tags form part of several equipment orders relating to the Letter of Intent announced in May 2011, which covers the joint development of an RFID system for use on mainline railways in China.
  • EU funds port development
    December 9, 2014
    The EU's TEN-T Programme is to provide function of over US$1 million for development studies of the Austrian port of Linz, an important intersection of continuously increasing international freight flows between inland water, rail and road transport. The project aims to increase the port's capacity to receive larger inland water, rail and road transport flows. The project features design studies for the expansion of the tri-modal terminal at the port to address its growing needs. It will deliver a maste