Skip to main content

Siemens to automate New York’s Queens Boulevard subway

Siemens has been awarded a US$156 million contract by the Metropolitan Transportation Authority (MTA) to install communications-based train control (CBTC) on the Queens Boulevard Line, one of the busiest subway lines on the New York City transit system. Siemens is supplying the onboard equipment for a total of 305 trains and installing the wayside signalling technology at seven of eight field locations.
August 28, 2015 Read time: 2 mins

189 Siemens has been awarded a US$156 million contract by the Metropolitan Transportation Authority (MTA) to install communications-based train control (CBTC) on the Queens Boulevard Line, one of the busiest subway lines on the New York City transit system.

Siemens is supplying the onboard equipment for a total of 305 trains and installing the wayside signalling technology at seven of eight field locations.

The radio-based CBTC technology provides real-time data on vehicle position and speed conditions, allowing system operators to safely increase the number of vehicles on a rail line. This results in greater frequency of train arrivals and allows MTA to accommodate more passengers on its system. The technology reduces the amount of wayside equipment and, as a result, reduces maintenance costs and service disruptions. Additionally, the technology precisely locates each train on the tracks and controls speed, improving on-time performance for riders and employees.

The system will be managed and deployed by Siemens New York City based rail automation team of CBTC experts which has been working with NYCT for over 15 years.

“Through our work on the Canarsie line, we’ve seen first-hand that CBTC technology can have a significant positive impact on ridership for the New York City subway system,” said John Paljug, head of Siemens Rail Automation. “We’re extremely excited to extend our technology partnership with the MTA and bring advanced automation technology to riders on the Queens Boulevard line.”

Development work is expected to begin on the Queens Boulevard line late this summer with the major installation beginning in mid-2017.

For more information on companies in this article

Related Content

  • Wireless traffic management reduces costs and commute times
    January 30, 2012
    The County of Los Angeles is widely known for having among the worst traffic problems and the most road congestion in the US. To combat these problems, the Los Angeles County Department of Public Works decided to deploy a wireless communications system to connect over 1,000 of the most congested intersections so they could dynamically monitor and manage the congestion and reduce commute times.
  • Legal streetfight brews as Trump 'saves' New York from congestion charge
    February 20, 2025
    MTA lawyers challenge USDoT move to shut down Manhattan toll scheme
  • App informs drivers of delays during Long Beach bridge replacement
    June 6, 2014
    David Crawford previews a work zone travel breakthrough. In February 2014, the Port of Long Beach in California launched what it claims is a groundbreaking construction zone navigation aid - LB Bridge mobile app. The app is designed to help drivers during the Gerald Desmond Bridge replacement programme by keeping them up to date on activity and the ensuing traffic diversions when construction starts in summer 2014. The unusually content-rich app is designed to convey current project news (enlivened by phot
  • Major new traffic signal maintenance contract awarded in Scotland
    August 12, 2015
    Glasgow City Council and West Dunbartonshire Council have awarded a joint contract to Siemens to maintain roadside traffic control and information equipment for a period of up to five years, commencing 1 August 2015. The new contract includes the provision of associated ancillary support services, as well as the supply of works and services to support the Councils’ traffic control operation and periodical planned signal and optical maintenance, With equipment at over 500 traffic signal intersections and