Skip to main content

Shell consortium plans bulk hydrogen production project

A consortium of Shell Deutschland Oil and Shell Energy Europe with partners ITM Power, SINTEF, thinkstep and Element Energy plans a project to install a large scale electrolyser to produce hydrogen at the Wesseling refinery site within the Rheinland Refinery Complex. With a capacity of ten megawatts, this would be the largest unit of its kind in Germany and the world’s largest PEM (Polymer Electrolyte Membrane) electrolyser.
September 4, 2017 Read time: 2 mins

A consortium of Shell Deutschland Oil and Shell Energy Europe with partners ITM Power, SINTEF, thinkstep and Element Energy plans a project to install a large scale electrolyser to produce hydrogen at the Wesseling refinery site within the Rheinland Refinery Complex.

With a capacity of ten megawatts, this would be the largest unit of its kind in Germany and the world’s largest PEM (Polymer Electrolyte Membrane) electrolyser. This electrolyser technology is also suitable to improve the stability of the electricity grid with a growing share of intermittent renewable energy sources, such as from solar and wind.

The consortium has been invited to the preparation of a grant agreement by the European Fuel Cells and Hydrogen 2 Joint Undertaking (FCH 2 JU), following a competitive call for proposals.

Today, the refinery uses approximately 180,000 tons of hydrogen per year in its various plants. The hydrogen is currently produced as a by-product of the refining process or through natural gas reforming, while electrolysis uses electricity to split water into the base components of hydrogen and oxygen.

The project aims to enable the construction and operation of a large scale10 MW electrolyser that can produce high quality hydrogen and CO2 free hydrogen while demonstrating technology and cost improvements through up-scaling and new business applications. Electrolysis using low-cost renewable electricity could be a key technology for a potential CO2 free hydrogen production in the Shell Rheinland Refinery.

Related Content

  • April 18, 2012
    Key Russian PPP project
    The Northern Capital Highway (NCH) consortium has been named the preferred bidder in the tender for the central section of St Petersburg’s Western High-Speed Diameter (WHSD) project. Should NCH win the tender process it will build and then operate the entire stretch of the toll road. The consortium comprises VTB Capital and Gazprombank from Russia in partnership with Italian company Astaldi and Turkish firm Ictas Insaat.
  • September 6, 2017
    Options abound for road weather sensing
    Meteorological organisations invest millions in super-computers to crunch data for ever-more accurate forecasts but inherent unpredictability means that other methods of alerting drivers and road authorities to fast-changing weather and highway conditions are essential. For years, static weather sensors to measure factors such as surface water, ice or high roadway temperatures have been embedded in highways to provide such data. But that is changing.
  • June 5, 2015
    Tolling is the 21st century’s road funding solution
    HNTB’s Rick Herrington and Brad Guilmino put the case for tolling. Tolling is becoming the 21st century solution of choice for generating additional user-based transportation revenue. The proven funding source is being seriously considered for expanded use by cities, states and even the federal government with support from elected officials across the political spectrum. In fact, with each federal transportation reauthorisation, tolling restrictions have been relaxed.
  • November 9, 2012
    US ushers in reforms with new transportation bill
    On behalf of ITS America, Paul Feenstra maps out implications and opportunities for the ITS industry. A critical milestone was reached last month when the US Congress passed, and President Obama signed, legislation reauthorising the nation’s surface transportation programmes, breaking a nearly three-year log-jam which had stymied critical transportation reforms and delayed much-needed infrastructure projects. The law, numbered P.L. 112-141 but known as MAP-21 (Moving Ahead for Progress in the 21st Century),