Skip to main content

Serco wins Dubai Metro contract extension to 2021

Serco has signed a two-year extension with Dubai’s Roads and Transport Authority (RTA) to continue operating and maintaining Dubai Metro until September 2021. HE Mattar Al Tayer, director general and chairman of the board of executive directors of the RTA, says: “Serco has delivered operational performance levels on the Dubai Metro with a high train service availability of 99.9% and a punctuality of 99.8%, achieving a record of 204 million journeys in 2018.” The £140m contract includes the operation
April 10, 2019 Read time: 1 min

1676 Serco has signed a two-year extension with Dubai’s Roads and Transport Authority (RTA) to continue operating and maintaining Dubai Metro until September 2021.

HE Mattar Al Tayer, director general and chairman of the board of executive directors of the RTA, says: “Serco has delivered operational performance levels on the Dubai Metro with a high train service availability of 99.9% and a punctuality of 99.8%, achieving a record of 204 million journeys in 2018.”

The £140m contract includes the operation and maintenance of the Red Line expansion which is currently under construction. A test run of the expanded service is expected to start in February next year in readiness for full operation ahead of Expo 2020, which begins in October.

Serco says the Red Line expansion adds 15km and provides Dubai Metro with a total length of 90km and over 120 trains running at peak times.

For more information on companies in this article

Related Content

  • Taking tolling towards new opportunities
    May 18, 2016
    Vinci’s André Broto presented his views on how the tolling industry could play an important role in helping authorities ease urban congestion, to delegates at the IBTTA conference. As director of foresight and strategy at Vinci Autoroutes, France, André Broto has been spending some time considering the future of tolling in his own country and worldwide. He presented his thoughts, which include a very different angle of the causes of, and solutions to, congestion at the IBTTA’s (International Bridge, Tunnel
  • On-road and in-vehicle are not in competition
    May 18, 2018
    The integrity and accuracy of data that can be verified by weigh-in-motion technology has been improving for decades – and the range of WIM applications is increasing at a tremendous pace. Chris Koniditsiotis, president of the International Society for Weigh-in-Motion (ISWIM) and CEO of Transport Certification Australia (TCA), began his career in 1985 as a pavements engineer. “When I joined this portfolio, the integrity, accuracy, and sampling frequency of mass information delivered at best an estimate, us
  • Dubai trials autonomous vehicles
    November 16, 2016
    The Dubai Roads and Transport Authority (RTA), in collaboration with Dubai Properties, has recently begun the trial operation of autonomous vehicles, each capable of carrying ten passengers, within the Business Bay District over a 650 metre-long track. This follows the success of the first and second phases of the trial operation of smart vehicles in the Dubai World Trade Center and the Mohammed bin Rashid Boulevard. The electric-powered smart vehicle is designed to move within closed internal roads in a
  • An innovation lab – not a burden
    June 27, 2018
    Travellers want to be able to book multimodal journeys easily – and to be informed of problems and alternatives as they go. Adam Roark might just be able to help, finds Ben Spencer. The global shift in transportation towards members of the public wanting access to multimodal journeys is rapidly changing how people pay and plan ahead. Buying tickets from a machine and dealing with the frustration of discovering your train is cancelled is a scenario commuters want to avoid through technology’s ability to