Skip to main content

Second phase of Sungai Buloh-Kajang mass rapid transit enters operation, Malaysia

The second phase of the Sungai Buloh-Kajang Mass Rapid Transit line in Malaysia has entered operation. Mott MacDonald was responsible for the detailed design, modelling and construction supervision of three underground stations and four elevated stations on the line. The 51km line features 31 stations and will serve the 1.2 million residents of the Klang Valley area of Kuala Lumpur. In the capital, there are 9.5km of tunnels with seven underground stations and two portals linking the above ground track t
August 25, 2017 Read time: 2 mins
The second phase of the Sungai Buloh-Kajang Mass Rapid Transit line in Malaysia has entered operation. 1869 Mott MacDonald was responsible for the detailed design, modelling and construction supervision of three underground stations and four elevated stations on the line.


The 51km line features 31 stations and will serve the 1.2 million residents of the Klang Valley area of Kuala Lumpur. In the capital, there are 9.5km of tunnels with seven underground stations and two portals linking the above ground track to the underground.

Mott MacDonald designed and modelled the Tun Razak Exchange, Cochrane and Maluri underground stations and elevated stations at Taman Pertama, Taman Midah, Taman Mutiara and Taman Connaught. This included features such as tunnels and viaducts, vent and intervention shafts, link bridges, entrances to commercial buildings, platform and concourse areas, operational rooms, station entrances, landscaping and external works.

Design services provided by the consultancy included architecture, building services, building information modelling (BIM), civil, structural, geotechnical and fire engineering, site supervision and other rail-associated disciplines.

For more information on companies in this article

Related Content

  • Pioneering new passenger information systems
    February 3, 2012
    Chicago pioneers new passenger information initiatives. By David Crawford
  • Aarsleff to build tunnels on new Danish railway
    February 7, 2014
    Banedanmark (Rail Net Denmark) has awarded construction company Per Aarsleff a US$ 166.66 million contract to build two tunnels on the 3.7 km tunnel of the new railway route between Copenhagen and Ringsted. The project will be carried out as a turnkey contract during the next three years with expected completion in the spring of 2017. The two tunnels, of 560 metres and 695 metres respectively, are to be carried out as cut and cover tunnels built on site in open excavations down to a depth of 11 met
  • Data helps Ohio DoT get grant money
    January 25, 2022
    Ohio Department of Transportation turned to StreetLight Data when it needed to finalise grant money for a key infrastructure link. David Crawford sees how metrics brought in the cash…
  • Aecon consortium selected for Eglinton Crosstown light rail transit project
    June 11, 2015
    Crosslinx Transit Solutions, consisting of Aecon, ACS Infrastructure Canada, EllisDon, and SNC-Lavalin, has been selected by Metrolinx and Infrastructure Ontario as the preferred supplier for the development of the Eglinton Crosstown light rail transit project in Toronto.