Skip to main content

Second phase of Sungai Buloh-Kajang mass rapid transit enters operation, Malaysia

The second phase of the Sungai Buloh-Kajang Mass Rapid Transit line in Malaysia has entered operation. Mott MacDonald was responsible for the detailed design, modelling and construction supervision of three underground stations and four elevated stations on the line. The 51km line features 31 stations and will serve the 1.2 million residents of the Klang Valley area of Kuala Lumpur. In the capital, there are 9.5km of tunnels with seven underground stations and two portals linking the above ground track t
August 25, 2017 Read time: 2 mins
The second phase of the Sungai Buloh-Kajang Mass Rapid Transit line in Malaysia has entered operation. 1869 Mott MacDonald was responsible for the detailed design, modelling and construction supervision of three underground stations and four elevated stations on the line.


The 51km line features 31 stations and will serve the 1.2 million residents of the Klang Valley area of Kuala Lumpur. In the capital, there are 9.5km of tunnels with seven underground stations and two portals linking the above ground track to the underground.

Mott MacDonald designed and modelled the Tun Razak Exchange, Cochrane and Maluri underground stations and elevated stations at Taman Pertama, Taman Midah, Taman Mutiara and Taman Connaught. This included features such as tunnels and viaducts, vent and intervention shafts, link bridges, entrances to commercial buildings, platform and concourse areas, operational rooms, station entrances, landscaping and external works.

Design services provided by the consultancy included architecture, building services, building information modelling (BIM), civil, structural, geotechnical and fire engineering, site supervision and other rail-associated disciplines.

For more information on companies in this article

Related Content

  • Doha Metro contract awarded
    March 12, 2014
    A consortium led by Spain’s FCC and comprising Archirodon (Greece), Yüksel (Turkey) and Petroserv (Qatar) has announced that it has been awarded a US$700 million contract to build the Red Line, a section of Doha Metro. The contract includes building three elevated stations and a 6.97 kilometre section and the construction of a tunnel. The execution period is 31 months and the project will create more than 1,000 jobs, the consortium said. The metro is due for completion in 2019.
  • Speeding the recovery of stranded commercial vehicles is paying dividends in Georgia
    April 9, 2014
    Delcan’s Cheryl-Marie Hansberger details how Georgia’s Towing and Recovery Incentive Program (TRIP) has improved road safety and helped to reduce traffic congestion in the metro Atlanta region. By 2008, steady increases in population had led the Texas Transportation Institute to declare Atlanta, Georgia to be the third most congested city in the US. In an effort to increase road user safety and mitigate the effects of traffic, the Georgia Department of Transportation (GDOT) and its local partners have imple
  • Priority is on transit for Lyt and Octa in Orange County
    September 30, 2024
    Advanced traffic signal prioritisation tech is designed to improve daily commutes
  • Priority boosts ridership and cuts congestion
    May 4, 2016
    Transit priority is proving a win-win in Europe and Australia. David Crawford reports. Technology that integrates with the Australian-originated Sydney Coordinated Adaptive Traffic System (SCATS) is driving bus signal priority and performance analysis initiatives on both sides of the world; in its homeland, with a major deployment in 2015, and in the capital of the Republic of Ireland.