Skip to main content

Second phase of Sungai Buloh-Kajang mass rapid transit enters operation, Malaysia

The second phase of the Sungai Buloh-Kajang Mass Rapid Transit line in Malaysia has entered operation. Mott MacDonald was responsible for the detailed design, modelling and construction supervision of three underground stations and four elevated stations on the line. The 51km line features 31 stations and will serve the 1.2 million residents of the Klang Valley area of Kuala Lumpur. In the capital, there are 9.5km of tunnels with seven underground stations and two portals linking the above ground track t
August 25, 2017 Read time: 2 mins
The second phase of the Sungai Buloh-Kajang Mass Rapid Transit line in Malaysia has entered operation. 1869 Mott MacDonald was responsible for the detailed design, modelling and construction supervision of three underground stations and four elevated stations on the line.


The 51km line features 31 stations and will serve the 1.2 million residents of the Klang Valley area of Kuala Lumpur. In the capital, there are 9.5km of tunnels with seven underground stations and two portals linking the above ground track to the underground.

Mott MacDonald designed and modelled the Tun Razak Exchange, Cochrane and Maluri underground stations and elevated stations at Taman Pertama, Taman Midah, Taman Mutiara and Taman Connaught. This included features such as tunnels and viaducts, vent and intervention shafts, link bridges, entrances to commercial buildings, platform and concourse areas, operational rooms, station entrances, landscaping and external works.

Design services provided by the consultancy included architecture, building services, building information modelling (BIM), civil, structural, geotechnical and fire engineering, site supervision and other rail-associated disciplines.

Related Content

  • Transport problems need ''strong action from policymakers”
    June 7, 2012
    Taking advantage of the attendance of the heads of ITS Asia-Pacific, ITS America, Ertico – ITS Europe, and ITS Malaysia as the host nation of the recent 12th ITS Asia-Pacific Forum in Kuala Lumpur in April, ITS International initiated a round table discussion on the big ITS issues confronting the individual regions. For such a diverse collection of advanced and emerging nations spanning the globe, in terms of the advancement of ITS, a common single issue emerges above all others
  • Open data gives new lease of life to public travel information screens
    March 4, 2014
    David Crawford finds resurgent interest in travel information screens for buildings. With city governments worldwide increasingly opening up and sharing their public transport data for general use, attention is focusing on the potential financial benefits – to transit operators and businesses more widely. Professor Stephen Goldsmith, who directs the US’ Harvard University’s Data-Smart City Solutions Project says: “Amid nationwide public-sector budget cuts, open data is providing a road map for improving tra
  • Keolis Shanghai opens first section of Songjiang tram line
    January 9, 2019
    Keolis Shanghai, a joint venture with Shanghai Shentong Metro, has opened the first section of the Songjiang tram line, offering connections to Shanghai Metro Line 6. The first phase is expected to transport 170,00 passengers per day. The 13.9km route runs across Songjiang, a suburban district, and includes 20 stations from Canghua Rd station in the west to Zhongchen Rd station in the east which serves residential areas and universities. The service is being operated with 15 Citadis trams manufacture
  • STV selected to design Massachusetts rail extension
    May 10, 2018
    Transport design firm STV has been chosen as lead designer for the Massachusetts Bay Transportation Authority’s (MBTA’s) $1.3bn Green Line Light Rail Extension (GLX). MBTA expects the 4.3 mile expanded route to reduce up to 26,000 regional daily vehicle miles travelled, improving air quality and reducing congestion. Once completed, the increased line will provide commuters in Cambridge, Somerville and Medford with journeys to downtown Boston. Construction is expected to begin later this year, with the se