Skip to main content

Second phase of Sungai Buloh-Kajang mass rapid transit enters operation, Malaysia

The second phase of the Sungai Buloh-Kajang Mass Rapid Transit line in Malaysia has entered operation. Mott MacDonald was responsible for the detailed design, modelling and construction supervision of three underground stations and four elevated stations on the line. The 51km line features 31 stations and will serve the 1.2 million residents of the Klang Valley area of Kuala Lumpur. In the capital, there are 9.5km of tunnels with seven underground stations and two portals linking the above ground track t
August 25, 2017 Read time: 2 mins
The second phase of the Sungai Buloh-Kajang Mass Rapid Transit line in Malaysia has entered operation. 1869 Mott MacDonald was responsible for the detailed design, modelling and construction supervision of three underground stations and four elevated stations on the line.


The 51km line features 31 stations and will serve the 1.2 million residents of the Klang Valley area of Kuala Lumpur. In the capital, there are 9.5km of tunnels with seven underground stations and two portals linking the above ground track to the underground.

Mott MacDonald designed and modelled the Tun Razak Exchange, Cochrane and Maluri underground stations and elevated stations at Taman Pertama, Taman Midah, Taman Mutiara and Taman Connaught. This included features such as tunnels and viaducts, vent and intervention shafts, link bridges, entrances to commercial buildings, platform and concourse areas, operational rooms, station entrances, landscaping and external works.

Design services provided by the consultancy included architecture, building services, building information modelling (BIM), civil, structural, geotechnical and fire engineering, site supervision and other rail-associated disciplines.

Related Content

  • April 9, 2014
    Kuala Lumpur replaces obsolete traffic management system
    With its integrated transport information system (ITIS) in ruins and waiting to be sold for salvage, Kuala Lumpur’s government has awarded a contract to improve its traffic management. GTC Global won the US$62 million contract last year to bring ITIS back on track. The company was recently acquired by Telekom Malaysia. In 2002, a traffic surveillance system costing more than US$93 million was launched to gather, process and supply real-time traffic information to reduce congestion in Kuala Lumpur. It we
  • April 16, 2012
    12th Asia-Pacific ITS Forum opens in Kuala Lumpur
    The 12th Asia-Pacific Forum, which opened today in Kuala Lumpur, Malaysia, has attracted more than 700 participants from more than 20 countries with eminent speakers and panelists from Europe, North America, as well as the Asia Pacific region. Comprising three plenary sessions, two executive sessions for the presentation of international reports on the latest state of development in the respective member countries, and 13 technical/special sessions covering a wide range of ITS-related topics, the forum is p
  • March 8, 2021
    IBTTA elects Fremier as vice president
    Bay Area Toll Authority's Andrew Fremier to take up 2021 leadership role at IBTTA
  • April 16, 2014
    Flagship French motorway inaugurated
    The inauguration of the French Landes A63 motorway marked the culmination of 27 months of major works carried out adjacent to traffic by the economic interest group GIE A63. The road concessionaire, Atlandes, of which Egis is a shareholder, had awarded the construction contract to GIE A63, which then hired Egis for the turnkey integration of fixed and operational equipment and an 80 per cent share of the engineering, procurement and construction management. Atlandes also awarded Egis the subsequent operati