Skip to main content

Second phase of Sungai Buloh-Kajang mass rapid transit enters operation, Malaysia

The second phase of the Sungai Buloh-Kajang Mass Rapid Transit line in Malaysia has entered operation. Mott MacDonald was responsible for the detailed design, modelling and construction supervision of three underground stations and four elevated stations on the line. The 51km line features 31 stations and will serve the 1.2 million residents of the Klang Valley area of Kuala Lumpur. In the capital, there are 9.5km of tunnels with seven underground stations and two portals linking the above ground track t
August 25, 2017 Read time: 2 mins
The second phase of the Sungai Buloh-Kajang Mass Rapid Transit line in Malaysia has entered operation. 1869 Mott MacDonald was responsible for the detailed design, modelling and construction supervision of three underground stations and four elevated stations on the line.


The 51km line features 31 stations and will serve the 1.2 million residents of the Klang Valley area of Kuala Lumpur. In the capital, there are 9.5km of tunnels with seven underground stations and two portals linking the above ground track to the underground.

Mott MacDonald designed and modelled the Tun Razak Exchange, Cochrane and Maluri underground stations and elevated stations at Taman Pertama, Taman Midah, Taman Mutiara and Taman Connaught. This included features such as tunnels and viaducts, vent and intervention shafts, link bridges, entrances to commercial buildings, platform and concourse areas, operational rooms, station entrances, landscaping and external works.

Design services provided by the consultancy included architecture, building services, building information modelling (BIM), civil, structural, geotechnical and fire engineering, site supervision and other rail-associated disciplines.

Related Content

  • November 29, 2024
    First three lines of Riyadh Metro to open
    Driverless mass transit system runs 176km in Saudi Arabia's capital
  • January 27, 2016
    Jacobs to provide technical advice for Welsh Government’s A465 improvements
    Jacobs Engineering Group is to provide the Welsh Government with technical advisory services for the upgrade of sections 5 and 6 of the A465 between Dowlais Top and Hirwaun. The A465 is a key transport link in Wales and forms part of the trans-European transport network. It is an important strategic route for the urban area of South Wales, providing routes between key settlements. It connects South and West Wales to the Midlands and beyond, to ports serving Ireland, and to other European destinations.
  • September 16, 2020
    Florida SunTrax centre wins top IBTTA award
    Florida's Turnpike Enterprise R&D facility has four toll sites for testing
  • July 27, 2018
    Nexus to upgrade Tyne Wear Metro control room in UK
    Nexus will install a computerised signalling control system at the Tyne and Wear Metro control room, in Newcastle, to help make train operations more efficient. The £12m project will take place from 4-5 August. Nexus is a UK public body which owns and manages Metro. The rapid transit and light rail system serves Newcastle upon Tyne, South Tyneside, North Tyneside and Sunderland in the Tyne and Wear region. Derby-based technology company Resonate will supply the computerised signalling control system