Skip to main content

Second phase of Sungai Buloh-Kajang mass rapid transit enters operation, Malaysia

The second phase of the Sungai Buloh-Kajang Mass Rapid Transit line in Malaysia has entered operation. Mott MacDonald was responsible for the detailed design, modelling and construction supervision of three underground stations and four elevated stations on the line. The 51km line features 31 stations and will serve the 1.2 million residents of the Klang Valley area of Kuala Lumpur. In the capital, there are 9.5km of tunnels with seven underground stations and two portals linking the above ground track t
August 25, 2017 Read time: 2 mins
The second phase of the Sungai Buloh-Kajang Mass Rapid Transit line in Malaysia has entered operation. 1869 Mott MacDonald was responsible for the detailed design, modelling and construction supervision of three underground stations and four elevated stations on the line.


The 51km line features 31 stations and will serve the 1.2 million residents of the Klang Valley area of Kuala Lumpur. In the capital, there are 9.5km of tunnels with seven underground stations and two portals linking the above ground track to the underground.

Mott MacDonald designed and modelled the Tun Razak Exchange, Cochrane and Maluri underground stations and elevated stations at Taman Pertama, Taman Midah, Taman Mutiara and Taman Connaught. This included features such as tunnels and viaducts, vent and intervention shafts, link bridges, entrances to commercial buildings, platform and concourse areas, operational rooms, station entrances, landscaping and external works.

Design services provided by the consultancy included architecture, building services, building information modelling (BIM), civil, structural, geotechnical and fire engineering, site supervision and other rail-associated disciplines.

Related Content

  • March 15, 2018
    Highways England offers public an insight into roadworks operations
    Highways England is offering members of the public an opportunity to see how roads and structures are built and maintained at five construction sites as part of the Open Doors initiative, from the 19-24 March. The project aims to inspire young people considering career ideas and adults thinking about a change of occupation to learn more about the range of skills and professionals needed on site. Three sites for the A14 Cambridge to Huntingdon road scheme in Swavesey, Brampton and Ermine Street will
  • January 30, 2018
    TST awarded signalling contract for shanghai automated metro line
    Shanghai Shentong Metro Group has awarded Thales SEC Transport the signalling contract for the Fully Automated Operation (FAO) Line 14 of the City’s Metro. It will provide an integrated management system as well as signalling and supervision solutions with the intention of meeting the demand for metro transport capacity and alleviating traffic in the downtown area. The driverless and highly automated line is scheduled to enter service at the end of 2020.
  • June 25, 2012
    Redflex wins $50 million enforcement system contract in Malaysia
    Redflex Traffic Systems has signed a contract for the supply of camera systems, back office software and related services for the automated enforcement system (AES) project in Malaysia. Beta Tegap Sdn Bhd, the company's distributor in Malaysia, has signed a Build, Own, Operate & Transfer contract with the Malaysian Government, subject to finance, for the area throughout central and southern Malaysia, encompassing the main corridor between Kuala Lumpur and Johor Bahru. Award of this contract comes after exte
  • May 24, 2022
    London's new £19bn transit line opens
    Elizabeth Line speeds up east-west travel in the UK capital and its surrounding areas