Skip to main content

Second phase of Sungai Buloh-Kajang mass rapid transit enters operation, Malaysia

The second phase of the Sungai Buloh-Kajang Mass Rapid Transit line in Malaysia has entered operation. Mott MacDonald was responsible for the detailed design, modelling and construction supervision of three underground stations and four elevated stations on the line. The 51km line features 31 stations and will serve the 1.2 million residents of the Klang Valley area of Kuala Lumpur. In the capital, there are 9.5km of tunnels with seven underground stations and two portals linking the above ground track t
August 25, 2017 Read time: 2 mins
The second phase of the Sungai Buloh-Kajang Mass Rapid Transit line in Malaysia has entered operation. 1869 Mott MacDonald was responsible for the detailed design, modelling and construction supervision of three underground stations and four elevated stations on the line.


The 51km line features 31 stations and will serve the 1.2 million residents of the Klang Valley area of Kuala Lumpur. In the capital, there are 9.5km of tunnels with seven underground stations and two portals linking the above ground track to the underground.

Mott MacDonald designed and modelled the Tun Razak Exchange, Cochrane and Maluri underground stations and elevated stations at Taman Pertama, Taman Midah, Taman Mutiara and Taman Connaught. This included features such as tunnels and viaducts, vent and intervention shafts, link bridges, entrances to commercial buildings, platform and concourse areas, operational rooms, station entrances, landscaping and external works.

Design services provided by the consultancy included architecture, building services, building information modelling (BIM), civil, structural, geotechnical and fire engineering, site supervision and other rail-associated disciplines.

Related Content

  • February 1, 2012
    Prospects for intercity transport technology
    Magnetic levitation has been dismissed as unproven, too costly, or pie in the sky. It's time to reappraise it. With the unveiling by China (see News section, page 10) of its own, home-grown magnetic levitation train, it would be odd if politicians, policy-makers and the ITS industry did not want to take a closer look at the 'unproven' technology that is magnetic levitation. Fortunately, doing so is easy. The non-profit International Society for Maglev Transportation (The International Maglev Board) has an e
  • February 6, 2012
    Prospects for intercity transport technology
    Magnetic levitation has been dismissed as unproven, too costly, or pie in the sky. It's time to reappraise it
  • September 30, 2015
    Canadian JV to build next phase of Ontario BRT
    Metrolinx and York Region Rapid Transit Corporation (YRRTC) today announced the award of a US$248 million contract to the EDCO joint venture to design, build and finance the next phase of the dedicated York Viva Bus Rapid Transit rapidways along the Highway 7 transit corridor Southern Ontario, Canada. This initiative is part of the York Viva BRT project which represents a US$1 billion transit investment from the Government of Ontario and is part of Metrolinx's 25-year Regional Transportation Plan for an
  • October 20, 2014
    Parsons JV lands contract with San Francisco BART
    Engineering group Parsons, in a joint venture with Acumen (APJV), has been selected to provide general engineering services (GES) to the San Francisco Bay Area Rapid Transit District (BART) over the next five years. The APJV team, composed of 11 sub-consultants, will deliver top-flight services in an array of technical disciplines, including architectural, civil, structural, mechanical, electrical, and systems project work. The team’s selection sends a clear signal to the community that BART is committed