Skip to main content

Second phase of Sungai Buloh-Kajang mass rapid transit enters operation, Malaysia

The second phase of the Sungai Buloh-Kajang Mass Rapid Transit line in Malaysia has entered operation. Mott MacDonald was responsible for the detailed design, modelling and construction supervision of three underground stations and four elevated stations on the line. The 51km line features 31 stations and will serve the 1.2 million residents of the Klang Valley area of Kuala Lumpur. In the capital, there are 9.5km of tunnels with seven underground stations and two portals linking the above ground track t
August 25, 2017 Read time: 2 mins
The second phase of the Sungai Buloh-Kajang Mass Rapid Transit line in Malaysia has entered operation. 1869 Mott MacDonald was responsible for the detailed design, modelling and construction supervision of three underground stations and four elevated stations on the line.


The 51km line features 31 stations and will serve the 1.2 million residents of the Klang Valley area of Kuala Lumpur. In the capital, there are 9.5km of tunnels with seven underground stations and two portals linking the above ground track to the underground.

Mott MacDonald designed and modelled the Tun Razak Exchange, Cochrane and Maluri underground stations and elevated stations at Taman Pertama, Taman Midah, Taman Mutiara and Taman Connaught. This included features such as tunnels and viaducts, vent and intervention shafts, link bridges, entrances to commercial buildings, platform and concourse areas, operational rooms, station entrances, landscaping and external works.

Design services provided by the consultancy included architecture, building services, building information modelling (BIM), civil, structural, geotechnical and fire engineering, site supervision and other rail-associated disciplines.

For more information on companies in this article

Related Content

  • Kapsch to design, build and support ATMS for PANYNJ
    February 27, 2017
    Kapsch TrafficCom North America has been awarded a four-year contract to design and install an agency-wide transportation management software (ATMS) for the Port Authority of New York and New Jersey (PANYNJ). The new system will utilise Kapsch’s DYNAC software, enabling the Authority to manage ITS assets at its bridges, tunnels, aviation and port facilities, as well as the PATH rail transit system from any of its individual facility operations control centres (OCC) and the Authority’s Agency Operation Ce
  • 100 on-demand AVs set for New Jersey
    January 12, 2022
    The deadline for RFEI response to potential new transit system in Trenton is 11 February
  • Strabag wins Dar Es Salaam BRT system work
    March 14, 2012
    Austrian building group Strabag has won a US$178 million contract to renovate and expand three major thoroughfares in the Tanzanian capital Dar Es Salaam as part of a scheme to introduce a bus rapid transit (BRT) system which will have separate priority bus lanes.
  • USDOT launches Connected Vehicle 102 Course
    May 15, 2015
    The Intelligent Transportation Systems Joint Program Office (ITS JPO) will unveil a new connected vehicle training workshop at ITS America's 25th Annual Meeting and Expo. The course, based on the successful Connected Vehicle 101 classes that the ITS JPO has been conducting since 2013, will be held on May 31, 2015, in the Welk Room of the Omni William Penn Hotel. This instructor-led workshop builds on the Connected Vehicle 101 workshop by providing additional details about future vehicle-to-vehicle and vehi