Skip to main content

Second pan-Europe hydrogen refuelling infrastructure deployed

This week sees the launch of a second pan-European deployment of hydrogen refuelling infrastructure and passenger and commercial fuel cell electric vehicles. The six-year Hydrogen Mobility Europe 2 (H2ME 2) project brings together 37 partners from across Europe and will include the deployment and operation of 1,230 fuel cell vehicles, the addition of 20 extra hydrogen-refuelling stations (HRS) to the European network and will test the ability of electrolyser-HRS to help balance the electrical grid. The p
June 15, 2016 Read time: 2 mins
This week sees the launch of a second pan-European deployment of hydrogen refuelling infrastructure and passenger and commercial fuel cell electric vehicles.

The six-year Hydrogen Mobility Europe 2 (H2ME 2) project brings together 37 partners from across Europe and will include the deployment and operation of 1,230 fuel cell vehicles, the addition of 20 extra hydrogen-refuelling stations (HRS) to the European network and will test the ability of electrolyser-HRS to help balance the electrical grid. The project has been developed under the auspices of the Hydrogen Mobility Europe (H2ME) initiative and supported by the Fuel Cells and Hydrogen Joint Undertaking (FCH JU) with funding from the European Union Horizon 2020 programme.

The US$112 million (€100 million) project aims to coordinate European activities and help support the early roll-out of hydrogen vehicles across Europe and will significantly expand the European hydrogen vehicles fleet.  In so doing, it intends to confirm the technical and commercial readiness of vehicles, fuelling stations and hydrogen production techniques.

H2ME 2 will produce recommendations and identify any gaps that may prevent full commercialisation, as well as collating results to support future investments.

Related Content

  • Report finds LED replacement lamps don’t meet criteria
    January 13, 2015
    The Lighting Research Center (LRC) at Rensselaer Polytechnic Institute has been conducting evaluations of LED replacement lamps, most recently those with a mogul base. Its report on phase 1 of the project, Mogul based LED replacement lamps, provides details of the market characterisation and pilot photometric testing of 18 representative mogul base LED lamps alone and in luminaires. LRC found that only four of the 18 lamps met the minimum DesignLights Consortium Qualified Products List criteria for retro
  • US announces major EV infrastructure boost
    February 16, 2023
    Biden-Harris Administration says measures mean "great American road trip can be electrified"
  • Elon Musk’s underground movement
    August 3, 2020
    The Boring Company is building tunnels under various US cities – but for what? Kristina Smith delves deep into a project which may (eventually) have real appeal for mass transit providers and transportation agencies
  • Success of first MOBiNET meeting
    February 21, 2013
    MOBiNET, the new ERTICO-led project which plans to develop and run an internet of mobility, a platform that links transport services and end users, recently concluded its first meeting. By developing a set of common tools and standards (collectively known as MOBiNET), the idea is make to mobile transport services, such as journey planning, automated ticketing, billing and vehicle tracking more accessible and more usable. As a 'cloud based' system MOBiNET will make it much easier for software developers to c