Skip to main content

Scania to deliver bus rapid transit system to Ghana

Scania has signed an agreement with Ghana’s Ministry for Transport to supply buses and equipment for the bus rapid transit system under implementation in Accra. Scania will supply 300 buses and ancillary equipment and services such as ticketing machines, workshop services, operational support and infrastructure. Accra, the capital and largest city in Ghana, is facing a severe traffic situation that needs to be addressed by the use of high capacity buses. The BRT solution provides an answer to the proble
March 20, 2014 Read time: 2 mins
570 Scania has signed an agreement with Ghana’s Ministry for Transport to supply buses and equipment for the bus rapid transit system under implementation in Accra. Scania will supply 300 buses and ancillary equipment and services such as ticketing machines, workshop services, operational support and infrastructure.

Accra, the capital and largest city in Ghana, is facing a severe traffic situation that needs to be addressed by the use of high capacity buses. The BRT solution provides an answer to the problem at a reasonable cost compared to other alternatives. The use of BRT solutions is rapidly spreading over the whole African continent, with many cities facing the same challenges as Accra.

“The delivery to Accra marks a major step in increasing Scania’s presence in West Africa and will also serve as an important reference project for other cities in the region,” says Fredrik Morsing, regional director for Scania in West Africa.

The Minister for Transport, Hon. Mrs Dzifa A Attivor, states that “the government is committed to addressing the transportation bottlenecks in our cities and the BRT is a major transport policy being pursued by the Ministry.”

6865 BRT systems typically combine dedicated lanes, off-board fare collection, station platforms level with the bus floor and bus priority at intersections to achieve the speed of light rail or metro systems with the lower cost and simplicity of buses.

Related Content

  • July 22, 2013
    Haifa Metronit BRT system set to kick off
    The long-awaited overhaul to the Haifa metropolitan area’s public transportation system begins to take shape this week, as a portion of the extensive Metronit bus rapid transit (BRT) project starts to hit the roads throughout the region. Making use of approximately 40 kilometres of exclusive BRT lanes, the low-to-the-ground and high capacity Metronit aims for efficiency and convenience with its 84 efficient diesel and six hybrid vehicles, according to the Transportation Ministry. The first buses will appear
  • April 21, 2016
    Silos are last century’s thinking
    After 45 years in transportation, Ken Philmus sees the need for major change in a sector currently ill-prepared to meet the challenge of funding and rapidly advancing technological change. Having worked in both the public and private sectors, Ken Philmus, currently senior vice president of transportation solutions at Xerox, appreciates both approaches, but times are changing and he believes the sector needs to change too. “I like trains, planes and automobiles but I love the concept of mobility and that’s w
  • April 29, 2015
    NOCoE delivers data for diligent DOTs
    David Crawford talks to Dennis Motiani about the role of the new National Operations Centre of Excellence. Consolidating the collective experience of the US transportation system’s management and operations (TSM&O) community, streamlining its information gathering, while cutting research times and costs are the key drivers behind the country’s new National Operations Centre of Excellence (NOCoE). Launched in January at the annual meeting of the Transportation Research Board (TRB), this sets out to be a sin
  • May 24, 2021
    Cost Benefit: There’s still life in the RSU
    A mixture of mobile and static roadside units may be what’s required to fulfil the needs of connected vehicle communications