Skip to main content

São Paulo court stalls undersea tunnel

São Paulo state court TCE-SP has ordered a halt to the tender of São Paulo state's US$732 million project to build an underwater tunnel between the coastal cities of Santos and Guarujá. The project calls for the construction and operation of a 900 metre, six-lane submersed tunnel between Brazil's coastal cities of Santos and Guarujá. To be submerged at a depth of 21 metres, the tunnel would give the Santos port navigation channel a draft of 17 metres. Construction was scheduled to start in 2014 and c
February 3, 2015 Read time: 2 mins
São Paulo state court TCE-SP has ordered a halt to the tender of São Paulo state's US$732 million project to build an underwater tunnel between the coastal cities of Santos and Guarujá.

The project calls for the construction and operation of a 900 metre, six-lane submersed tunnel between Brazil's coastal cities of Santos and Guarujá. To be submerged at a depth of 21 metres, the tunnel would give the Santos port navigation channel a draft of 17 metres.

Construction was scheduled to start in 2014 and completed by2017.

The move responded to claims by bidding companies that there were a number of inconsistencies in the tender rules and that the time provided by state highway company

5947 Dersa, in charge of the tender process, was insufficient for proposals to be drawn up, according to local reports. Dersa now has five days to respond to the uncertainties and submit a copy of the bidding rules for TCE-SP analysis.

The tunnel is expected to take 44 months to build once the contract is awarded, São Paulo governor Geraldo Alckmin has said.

For more information on companies in this article

Related Content

  • MoDOT launches ‘Road to Tomorrow’
    June 22, 2015
    The Missouri Highways and Transportation Commission (MHTC) has launched plans to utilise innovation and construction rebuild the state’s oldest interstate highway, Interstate 90. It is to make the highway from Kansas City to St Louis available to private industry, entrepreneurs and innovators as a laboratory for construction of the next generation of highways. Missouri Department of Transportation (MoDOT) chief engineer Ed Hassinger has appointed a team of MoDOT experts to solicit and evaluate ideas fro
  • Iteris wins contract for National ITS Architecture Evolution and Support
    April 5, 2012
    Iteris has been awarded the prime contract from the US Research and Innovative Technology Administration (RITA) for the National Intelligent Transportation Systems (ITS) Architecture Evolution and Support programme, with a value of up to US$12.4 million over a five-year period. Over the last fifteen years, Iteris has provided the US federal government support in developing the National ITS Architecture and facilitating its implementation across the country. This task order-based contract, which is expected
  • The sunshine subsidy for Colorado’s tollways
    January 10, 2014
    David Crawford reports on energy cost cutting on US highways. Just over a year after switch-on and with two global awards under its belt, the longest solar-powered toll road in the US is generating heightened interest in highway applications of alternative energy. The E-407, which loops around the eastern perimeter of the Denver metropolitan area in Colorado, won the International Bridge, Tunnel and Turnpike Association (IBTTA) President’s Overall Award for Excellence at its September 2013 Annual Meeting in
  • Cubic names new general manager of Melbourne transport operations
    September 25, 2015
    Following its recent short-listing in the request for tender stage of the tender process to run the myki system in Melbourne, Australia, when the current contract expires in 2016, Cubic Transportation Systems has appointed Bruce Were as general manager of the company’s operations in Victoria. Were will have responsibility for handling the myki smart card ticketing project and will lead a Cubic team in Melbourne that is dedicated to working on the tender process, which is expected to be completed in mid-2