Skip to main content

São Paulo court stalls undersea tunnel

São Paulo state court TCE-SP has ordered a halt to the tender of São Paulo state's US$732 million project to build an underwater tunnel between the coastal cities of Santos and Guarujá. The project calls for the construction and operation of a 900 metre, six-lane submersed tunnel between Brazil's coastal cities of Santos and Guarujá. To be submerged at a depth of 21 metres, the tunnel would give the Santos port navigation channel a draft of 17 metres. Construction was scheduled to start in 2014 and c
February 3, 2015 Read time: 2 mins
São Paulo state court TCE-SP has ordered a halt to the tender of São Paulo state's US$732 million project to build an underwater tunnel between the coastal cities of Santos and Guarujá.

The project calls for the construction and operation of a 900 metre, six-lane submersed tunnel between Brazil's coastal cities of Santos and Guarujá. To be submerged at a depth of 21 metres, the tunnel would give the Santos port navigation channel a draft of 17 metres.

Construction was scheduled to start in 2014 and completed by2017.

The move responded to claims by bidding companies that there were a number of inconsistencies in the tender rules and that the time provided by state highway company

5947 Dersa, in charge of the tender process, was insufficient for proposals to be drawn up, according to local reports. Dersa now has five days to respond to the uncertainties and submit a copy of the bidding rules for TCE-SP analysis.

The tunnel is expected to take 44 months to build once the contract is awarded, São Paulo governor Geraldo Alckmin has said.

For more information on companies in this article

Related Content

  • Here: AI has place in ‘privacy by design’
    June 23, 2020
    Artificial intelligence may improve traffic in cities and keep location data private, but Here Technologies shows that it only takes four points of anonymous data to predict your identity.
  • Driver with 51 penalty points still allowed to drive
    January 12, 2016
    Three drivers with more than 40 points on their driving licences are still allowed on the road, according to a Freedom of Information request to the DVLA by the Institute of Advanced Motorists (IAM). The enquiry also found that 13 people in Britain currently have 28 or more points on their driving licence, the worst of those amassing 51 points. In addition, the numbers of drivers with 12 or more points has gone up by nine per cent in just seven months between March and October 2015 – from 6,884 to 7,517.
  • Vinci signs off first Brazil highway concession acquisition
    May 15, 2023
    Stake in Entrevias marks Vinci Concessions' plan to grow in Latin America's biggest economy
  • South Africa's first multi-lane free-flow tolling top of the line
    February 3, 2012
    Kapsch's Kjell Arnesson talks about the first multi-lane free-flow tolling project in South Africa. In South Africa, installation is ongoing as part of the Gauteng Freeway Improvement Project (GFIP) of the country's first Multi-Lane Free-Flow (MLFF) tolling system.