Skip to main content

São Paulo court stalls undersea tunnel

São Paulo state court TCE-SP has ordered a halt to the tender of São Paulo state's US$732 million project to build an underwater tunnel between the coastal cities of Santos and Guarujá. The project calls for the construction and operation of a 900 metre, six-lane submersed tunnel between Brazil's coastal cities of Santos and Guarujá. To be submerged at a depth of 21 metres, the tunnel would give the Santos port navigation channel a draft of 17 metres. Construction was scheduled to start in 2014 and c
February 3, 2015 Read time: 2 mins
São Paulo state court TCE-SP has ordered a halt to the tender of São Paulo state's US$732 million project to build an underwater tunnel between the coastal cities of Santos and Guarujá.

The project calls for the construction and operation of a 900 metre, six-lane submersed tunnel between Brazil's coastal cities of Santos and Guarujá. To be submerged at a depth of 21 metres, the tunnel would give the Santos port navigation channel a draft of 17 metres.

Construction was scheduled to start in 2014 and completed by2017.

The move responded to claims by bidding companies that there were a number of inconsistencies in the tender rules and that the time provided by state highway company

5947 Dersa, in charge of the tender process, was insufficient for proposals to be drawn up, according to local reports. Dersa now has five days to respond to the uncertainties and submit a copy of the bidding rules for TCE-SP analysis.

The tunnel is expected to take 44 months to build once the contract is awarded, São Paulo governor Geraldo Alckmin has said.

Related Content

  • September 17, 2013
    Tenders in for Brazil’s highways
    Brazil's national ground transport agency Agência Nacional de Transportes Terrestres (ANTT) has received eight bids for its US$1.34 billion BR-050 federal highway concession between the states of Goiás and Minas Gerais. The thirty-year concession involves the construction of the BR-050 highway, including restoration, maintenance, road widening and other improvements to provide a 437 kilometre highway along the Minas Gerais and São Paulo border, with six toll booths.
  • January 28, 2015
    Brazil considers south-east railway plan
    Espírito Santo governor Paulo Hartung is pushing for the construction of a US$2.69 billion railway that will connect sea ports in the south-eastern states of Espírito Santo and Rio de Janeiro. The proposed 550 kilometre railroad would connect Vitória and Anchieta ports in Espírito Santo to Rio's Açu port in the town of São João da Barra, and would be used for the transport of ore, according to one local paper. The project would contribute to Brazil's overall strategy to boost its commercial competitiv
  • May 1, 2015
    Brazilian bypass tender green-lighted
    Brazil's Pernambuco state environmental authorities have approved a preliminary licence for construction of the US$459 million Arco Metropolitano bypass road's São Lourenço da Mata-Cabo de Santo Agostinho stretch. National transport infrastructure department DNIT is preparing final details to tender the project in state capital Recife's metropolitan region. It includes developing a basic plan and executing civil works, said national transport federation CNT in a release The project to build a 45km two
  • July 30, 2013
    Virginia presses ahead with tunnels upgrade despite tolls challenge
    David Crawford reviews current developments and legal/financial issues facing tunnel management in Virginia. This autumn the Virginia Department of Transportation (VDOT) in the US will defend its plan to introduce tolling on the Elizabeth River tunnels linking the cities of Norfolk and Portsmouth in the State’s Hampton Roads area. The tolling, which is due to start from February 2014, will be examined by the State’s Supreme Court later this year. The anticipated toll income, along with loans and bonds, is