Skip to main content

São Paulo court stalls undersea tunnel

São Paulo state court TCE-SP has ordered a halt to the tender of São Paulo state's US$732 million project to build an underwater tunnel between the coastal cities of Santos and Guarujá. The project calls for the construction and operation of a 900 metre, six-lane submersed tunnel between Brazil's coastal cities of Santos and Guarujá. To be submerged at a depth of 21 metres, the tunnel would give the Santos port navigation channel a draft of 17 metres. Construction was scheduled to start in 2014 and c
February 3, 2015 Read time: 2 mins
São Paulo state court TCE-SP has ordered a halt to the tender of São Paulo state's US$732 million project to build an underwater tunnel between the coastal cities of Santos and Guarujá.

The project calls for the construction and operation of a 900 metre, six-lane submersed tunnel between Brazil's coastal cities of Santos and Guarujá. To be submerged at a depth of 21 metres, the tunnel would give the Santos port navigation channel a draft of 17 metres.

Construction was scheduled to start in 2014 and completed by2017.

The move responded to claims by bidding companies that there were a number of inconsistencies in the tender rules and that the time provided by state highway company

5947 Dersa, in charge of the tender process, was insufficient for proposals to be drawn up, according to local reports. Dersa now has five days to respond to the uncertainties and submit a copy of the bidding rules for TCE-SP analysis.

The tunnel is expected to take 44 months to build once the contract is awarded, São Paulo governor Geraldo Alckmin has said.

Related Content

  • June 12, 2015
    Brazil unveils major transportation, logistics concessions program
    Brazil's President Dilma Rousseff and her planning and finance ministers have announced US$64 billion expenditure in new infrastructure plans under the country's logistics investment program PIL. The largest investment has been earmarked for railways, including the country’s flagship project, the Brazil-Peru railway, which will connect the Atlantic and Pacific oceans, the Norte-Sul line and investment in existing concessions.
  • May 6, 2015
    Lima metro works to launch this month
    Construction work on Line 2 of the Lima metro will get underway this month on Lima's eastern outskirts, according to government officials. Construction works include a tunnel and five stations along the central highway from the district of Ate to Santa Anita, said José Zárate, head of the electric train authority (AATE). The US$5.8 billion metro line is scheduled for completion by 2020, transport and communications minister José Gallardo said. The industrial district of Ate will be linked to Lima's city
  • September 4, 2018
    ASECAP examines tolling’s trials, tribulations and triumphs
    If you want to get up to speed on the main issues facing the transport sector and tolling companies, ASECAP Study Days event in Ljubljana was a good place to start. Colin Sowman reports (Photographs: Louis David). Increasing populations, ever-higher technical and safety requirements, and electric and hybrid vehicles will provide both challenges and opportunities for tolling companies. The annual Study Days event organised by ASECAP (the European association for tolling companies) examined all of these aspec
  • January 31, 2012
    State of the art ITS technology for Doha tunnel management system
    Husam Musharbash, Traffic Tech Group, talks about tunnel management system implementation on the new route between Doha and the soon-to-open New Doha International Airport. The new Ras Abu Aboud Tunnel in Qatar, which opened to traffic in January of this year, will serve the New Doha International Airport once the latter opens in 2011.