Skip to main content

São Paulo court stalls undersea tunnel

São Paulo state court TCE-SP has ordered a halt to the tender of São Paulo state's US$732 million project to build an underwater tunnel between the coastal cities of Santos and Guarujá. The project calls for the construction and operation of a 900 metre, six-lane submersed tunnel between Brazil's coastal cities of Santos and Guarujá. To be submerged at a depth of 21 metres, the tunnel would give the Santos port navigation channel a draft of 17 metres. Construction was scheduled to start in 2014 and c
February 3, 2015 Read time: 2 mins
São Paulo state court TCE-SP has ordered a halt to the tender of São Paulo state's US$732 million project to build an underwater tunnel between the coastal cities of Santos and Guarujá.

The project calls for the construction and operation of a 900 metre, six-lane submersed tunnel between Brazil's coastal cities of Santos and Guarujá. To be submerged at a depth of 21 metres, the tunnel would give the Santos port navigation channel a draft of 17 metres.

Construction was scheduled to start in 2014 and completed by2017.

The move responded to claims by bidding companies that there were a number of inconsistencies in the tender rules and that the time provided by state highway company

5947 Dersa, in charge of the tender process, was insufficient for proposals to be drawn up, according to local reports. Dersa now has five days to respond to the uncertainties and submit a copy of the bidding rules for TCE-SP analysis.

The tunnel is expected to take 44 months to build once the contract is awarded, São Paulo governor Geraldo Alckmin has said.

For more information on companies in this article

Related Content

  • London’s zero-emission plan is premature, warns FTA
    October 24, 2018
    Plans to implement a clean air zone in London are premature, says a transport trade body - because zero-emission vehicles are not commercially viable. The Freight Transport Association (FTA) is unimpressed with the City of London Transport Strategy’s ambition to improve air quality and traffic in the east of the capital and the Barbican area by 2022. This draft scheme, which maps out a 25-year framework for managing streets within the City’s ‘Square Mile’, includes establishing a speed limit of 15 mp
  • Cost benefit: just $25 boosts pedestrian safety in Florida
    April 29, 2019
    A relatively straightforward change to the way that pedestrians cross the street in a Florida city has made a significant safety improvement. And what’s more, it was cheap, finds David Crawford Installing a lead pedestrian interval (LPI) system at 25 central business district signalised intersections in the Florida city of Lakeland has cut numbers of incidents involving pedestrians by some 60% - at a cost of US$25 for 30 minutes' work, according to traffic operations manager Angelo Rao.
  • Advanced ITS truck screening aids border control
    March 14, 2012
    State-of-the-art ITS technologies are being deployed for tracking of commercial vehicles at the US-Mexico border in Arizona, reports Pete Goldin. The border between the US and Mexico may be the epitome of America's wild west, but this remote desert frontier is being tamed by the Arizona Department of Transportation (ADOT) with a state-of-the-art ITS system. A comprehensive port-of-entry (POE) screening system is being deployed at the Mariposa Port of Entry – one of the busiest land ports in the nation – at
  • Advanced ITS truck screening aids border control
    March 14, 2012
    State-of-the-art ITS technologies are being deployed for tracking of commercial vehicles at the US-Mexico border in Arizona, reports Pete Goldin. The border between the US and Mexico may be the epitome of America's wild west, but this remote desert frontier is being tamed by the Arizona Department of Transportation (ADOT) with a state-of-the-art ITS system. A comprehensive port-of-entry (POE) screening system is being deployed at the Mariposa Port of Entry – one of the busiest land ports in the nation – at