Skip to main content

Santiago's public transport system ‘at full capacity‘

Santiago's public transport system is operating at full capacity, Chilean President Michelle Bachelet said. Her comments come after a power failure resulted in the closure of three key metro lines on Friday, leading to the worst service disruptions in the subway network's history, forcing hundreds of thousands of commuters to find alternative means of transport. The shutdown caused Metro de Santiago president Aldo González to resign and government and opposition lawmakers have asked transport minister
November 18, 2014 Read time: 2 mins
Santiago's public transport system is operating at full capacity, Chilean President Michelle Bachelet said.

Her comments come after a power failure resulted in the closure of three key metro lines on Friday, leading to the worst service disruptions in the subway network's history, forcing hundreds of thousands of commuters to find alternative means of transport.

The shutdown caused Metro de Santiago president Aldo González to resign and government and opposition lawmakers have asked transport minister Andrés Gómez-Lobo to step down.

It also caused strong increases in traffic for traffic apps company Easy Taxi, which said it saw a 60 per cent increase in use during the peak morning rush hour, and sent out messages to taxi drivers that use the service to work ‘collaboratively’ to allow multiple passengers ride in one cab to alleviate the congestion.

Santiago's public transport problems have been a headache for Bachelet since her first administration (2006-2010). In 2007 she launched the huge transport system 5348 Transantiago, designed to improve residents' daily commute by reducing the number of buses circulating, reorganising routes and improving connections with metro lines.

However, taking buses off the streets in several neighbourhoods only angered residents, who claimed that things were worse instead of better.

Seven years later, Transantiago has cost Chileans over US$10 billion in subsidies and bus and metro services in the city have deteriorated.

The government recently announced a US$4.2 billion investment in new public transport systems countrywide, including another metro line in Santiago.

For more information on companies in this article

Related Content

  • Report analyses multiple ITS projects to highlight cost and benefits
    March 16, 2015
    Every year in America cost benefit analysis is carried out on dozens of ITS installations and pilot studies and the findings, along with the lessons learned, are entered into the Department of Transportation’s (USDOT’s) web-based ITS Knowledge Resources database. This database holds more than 1,600 reports and periodically the USDOT reviews the material on file to draw conclusions from this wider body of evidence. It has just published one such review ITS Benefits, Costs, and Lessons Learned: 2014 Update Re
  • Is road user charging the first stop for congestion management?
    July 23, 2012
    David Hytch, Information Systems Director at the Greater Manchester Public Transport Executive, considers just where congestion pricing schemes should sit in transport planners' hierarchy of options for managing demand. On the face of it, Greater Manchester in England's proposed congestion charging scheme hit just about every sweet spot possible when it came to convincing the general public of the need for and benefits of such a venture. There was the promise from national government of almost £3bn-worth of
  • Global cities transform space for post-Covid transport
    May 7, 2020
    Glimpses are beginning to emerge of how European and US cities plan to change the way people travel.
  • Future-proofing transportation with a one-stop optical network solution
    July 20, 2021
    Huawei is helping transportation customers leverage optical transmission networks to optimise their communications and ensure business survival in the fast-changing worlds of road, rail, aviation, maritime and logistics