Skip to main content

Santiago's public transport system ‘at full capacity‘

Santiago's public transport system is operating at full capacity, Chilean President Michelle Bachelet said. Her comments come after a power failure resulted in the closure of three key metro lines on Friday, leading to the worst service disruptions in the subway network's history, forcing hundreds of thousands of commuters to find alternative means of transport. The shutdown caused Metro de Santiago president Aldo González to resign and government and opposition lawmakers have asked transport minister
November 18, 2014 Read time: 2 mins
Santiago's public transport system is operating at full capacity, Chilean President Michelle Bachelet said.

Her comments come after a power failure resulted in the closure of three key metro lines on Friday, leading to the worst service disruptions in the subway network's history, forcing hundreds of thousands of commuters to find alternative means of transport.

The shutdown caused Metro de Santiago president Aldo González to resign and government and opposition lawmakers have asked transport minister Andrés Gómez-Lobo to step down.

It also caused strong increases in traffic for traffic apps company Easy Taxi, which said it saw a 60 per cent increase in use during the peak morning rush hour, and sent out messages to taxi drivers that use the service to work ‘collaboratively’ to allow multiple passengers ride in one cab to alleviate the congestion.

Santiago's public transport problems have been a headache for Bachelet since her first administration (2006-2010). In 2007 she launched the huge transport system 5348 Transantiago, designed to improve residents' daily commute by reducing the number of buses circulating, reorganising routes and improving connections with metro lines.

However, taking buses off the streets in several neighbourhoods only angered residents, who claimed that things were worse instead of better.

Seven years later, Transantiago has cost Chileans over US$10 billion in subsidies and bus and metro services in the city have deteriorated.

The government recently announced a US$4.2 billion investment in new public transport systems countrywide, including another metro line in Santiago.

For more information on companies in this article

Related Content

  • Making the case for ALPR in enforcement
    February 2, 2012
    Federal Signal's Brian Shockley uses examples from around the world to make the case for the greater use of automatic license plate recognition technology in the US. It is time, he says, to consider the possibilities of a national network and the use of average speed enforcement
  • Optibus software rolled out across buses in Brazil's Porto Alegre
    September 14, 2023
    First Latin American city to use firm's software to plan and schedule entire bus fleet
  • Rapid transit bus route for Mexico
    January 2, 2013
    The first step towards a long-awaited reform of Tijuana’s antiquated and inefficient public transportation system is scheduled to begin early in 2013, with the construction of a 10.5 mile rapid-transit bus route linking the San Ysidro border to the eastern El Florido area of the city. The city is currently served by a disorganised network of buses and taxis. The US$123 million project, known as Ruta Troncal Número 1, is expected to serve more than 120,000 residents a day. Mexico’s federal development bank,
  • Russia 2018 World Cup: ITS can win it
    June 5, 2018
    Teams and supporters will cover vast distances in Russia for the 2018 FIFA World Cup. Stephane Clauss from Sony Europe’s Image Sensing Solutions division examines how the latest camera technologies can be deployed to help things run smoothly over the next month or so... For one month, from June 14, Russia is hosting the 2018 FIFA World Cup. This is the largest country in the world and the distances between venues will be larger than at almost any other World Cup - bar the finals in the US and Brazil.