Skip to main content

Santiago's public transport system ‘at full capacity‘

Santiago's public transport system is operating at full capacity, Chilean President Michelle Bachelet said. Her comments come after a power failure resulted in the closure of three key metro lines on Friday, leading to the worst service disruptions in the subway network's history, forcing hundreds of thousands of commuters to find alternative means of transport. The shutdown caused Metro de Santiago president Aldo González to resign and government and opposition lawmakers have asked transport minister
November 18, 2014 Read time: 2 mins
Santiago's public transport system is operating at full capacity, Chilean President Michelle Bachelet said.

Her comments come after a power failure resulted in the closure of three key metro lines on Friday, leading to the worst service disruptions in the subway network's history, forcing hundreds of thousands of commuters to find alternative means of transport.

The shutdown caused Metro de Santiago president Aldo González to resign and government and opposition lawmakers have asked transport minister Andrés Gómez-Lobo to step down.

It also caused strong increases in traffic for traffic apps company Easy Taxi, which said it saw a 60 per cent increase in use during the peak morning rush hour, and sent out messages to taxi drivers that use the service to work ‘collaboratively’ to allow multiple passengers ride in one cab to alleviate the congestion.

Santiago's public transport problems have been a headache for Bachelet since her first administration (2006-2010). In 2007 she launched the huge transport system 5348 Transantiago, designed to improve residents' daily commute by reducing the number of buses circulating, reorganising routes and improving connections with metro lines.

However, taking buses off the streets in several neighbourhoods only angered residents, who claimed that things were worse instead of better.

Seven years later, Transantiago has cost Chileans over US$10 billion in subsidies and bus and metro services in the city have deteriorated.

The government recently announced a US$4.2 billion investment in new public transport systems countrywide, including another metro line in Santiago.

For more information on companies in this article

Related Content

  • Secretary Foxx sends six-year transportation bill to Congress
    March 31, 2015
    Over the past year, US Transportation Secretary Anthony Foxx has visited more than 100 communities and heard one common story about crumbling infrastructure and dwindling resources to fix it with. Foxx has now sent to Congress his solution to this problem: a long-term transportation bill that provides funding growth and certainty so that state and local governments can get back in the business of building things again. The Grow America Act reflects President Obama’s vision for a six-year, US$478 billion
  • IBTTA seeks transportation innovation
    December 16, 2016
    IBTTA’s Patrick Jones contemplates the need for, sources of and constraints on transportation innovation. For years now, visionary thinkers and doers in the highway transportation community have been laser-focused on the role of innovation in addressing the most pressing mobility challenges.
  • Washington’s smarter traffic signals could ease commuter congestion
    November 14, 2012
    City officials in Washington, DC, are launching a two-year test of technology that they hope will ease traffic gridlock and improve public safety in the city. In 2013, they will begin connecting traffic signals to existing high-speed network cables that run beneath the city streets. Once connected to the network, the signals will be equipped with video cameras and wi-fi hot spots. The test program will cover traffic lights at 16 intersections. According to governing.com the DC metro area regularly turns up
  • Managed motorways, hard shoulder running aids safety, saves time
    January 30, 2012
    The announcement that, in 2012/13, work to extend Managed Motorways to Junctions 5-8 of the M6 near Birmingham in the West Midlands is scheduled to start marks the next step for the UK's hard shoulder running concept, first introduced on the M42 in 2006. The M6 scheme is in fact one of several announced; over the next few years work will start on applying Managed Motorways to various sections of the M1, M25 London Orbital, M60 and M62. According to Paul Unwin, senior project manager with the Highways Agency