Skip to main content

San Francisco's Presidio Parkway completed

The long-awaited Presidio Parkway in San Francisco has opened to traffic. The US$1.1 billion project relied on US$363 million in federal funds, as well as US$152.5 million from the American Recovery and Reinvestment Act, and a US$150 million Transportation Infrastructure Finance and Innovation Act (TIFIA) loan. Since work began in 2009, the Presidio Parkway project replaced Doyle Drive, a 1.6-mile segment of SR-101 linking the city to the Golden Gate Bridge, connecting Marin and San Francisco counties, a
July 14, 2015 Read time: 2 mins
The long-awaited Presidio Parkway in San Francisco has opened to traffic. The US$1.1 billion project relied on US$363 million in federal funds, as well as US$152.5 million from the American Recovery and Reinvestment Act, and a US$150 million Transportation Infrastructure Finance and Innovation Act (TIFIA) loan.

Since work began in 2009, the Presidio Parkway project replaced Doyle Drive, a 1.6-mile segment of SR-101 linking the city to the Golden Gate Bridge, connecting Marin and San Francisco counties, and providing a major regional traffic link between the peninsula and North Bay Area counties.

The project area extends from the Golden Gate Bridge Toll Plaza on the west to Broderick Street on the east and includes local roads within the Presidio Trust. The Presidio Parkway is now a six-lane route with a southbound auxiliary lane between the Park Presidio Interchange connected to Highway 1 and the new Presidio access at Girard Road.

“In addition to solving a decades-old seismic protection problem for a critical Bay Area commuter route, this project represents the sort of large-scale infrastructure improvement America needs,” said U.S. Transportation Secretary Anthony Foxx. “We’re counting on Congress to pass the President's Grow America Act, so more projects like this can begin.”

“Safety is our top priority, and the completion of this project should bring peace of mind to all Bay Area drivers,” said Acting Federal Highway Administrator Gregory Nadeau. "Every city in the nation is counting on Congress to do the right thing and ensure there is long-term highway funding available to help them too.”

Related Content

  • Fitch: Smooth ride so far for US managed lanes
    March 9, 2017
    Managed lanes throughout the US are off to a good start in 2017, according to Fitch Ratings in its latest managed lanes peer review. Actual performance is so far exceeding Fitch’s rating case for the sector as a whole, with 95 Express in Northern Virginia and NTE (segments 1 and 2) in Texas proving to be notable examples. Also boosting long-term prospects for managed lanes is the performance on the longest operating facility, SR-91 in Orange County, California. This state road is seeing strong compound a
  • Kistler’s smooth ride on Caltrans info highway
    December 16, 2022
    Caltrans needed a solution to boost its outmoded traffic monitoring capability. Kistler’s KiTraffic Statistics met the California agency’s stringent requirements. And then came Covid…
  • Building the case for photo enforcement
    October 26, 2016
    As red light enforcement is returning to some intersections and being shut down at others, new evidence has been released backing the safety campaigners, reports Jon Masters. In 2014, 709 Americans were killed in red-light-running crashes and an estimated 126,000 were injured according to the Insurance Institute for Highway Safety (IIHS).
  • Green Light WIM
    July 30, 2012
    Beginning in the 1990s, Oregon was one of the first US states to use weigh-in-motion scales and transponder-based systems to enable trucks to avoid having to stop at weigh stations. Its Green Light preclearance system soon became a model for similar deployments throughout the country. Today, Green Light annually weighs and screens 1.6 million trucks as they approach 21 Oregon weigh stations and it preclears 1.5 million of them.