Skip to main content

San Francisco opts for Thales train control

Thales has been awarded a US$24.7 million contract by the San Francisco Municipal Transportation Agency (SFMTA) for the design and construction of advanced train control technology for the new Central Subway project, a 1.7 mile extension of the existing T Line. The company will supply its field-proven SelTrac communications based train control (CBTC) technology for the project, a solution designed to improve transit options for residents in one of the city’s most densely populated neighbourhoods, provide
October 21, 2014 Read time: 2 mins
596 Thales has been awarded a US$24.7 million contract by the 4802 San Francisco Municipal Transportation Agency (SFMTA) for the design and construction of advanced train control technology for the new Central Subway project, a 1.7 mile extension of the existing T Line.

The company will supply its field-proven SelTrac communications based train control (CBTC) technology for the project, a solution designed to improve transit options for residents in one of the city’s most densely populated neighbourhoods, provide a rapid transit link to a burgeoning technology and digital-media hub, and improve access to a premier commercial district and tourist attraction.

For SFMTA, the solution provides maximum performance in terms of headways, passenger throughput and energy conservation. It monitors the position of each train to a high degree of accuracy, which allows faster response times, more tightly controlled movements, and easier expandability and adaptability. In addition, the solution offers the opportunity to lower life-cycle costs and increase revenue by moving more people more quickly. For passengers, the BTC system will result in safe operations and a more predictable commute.

Thales already supplies automatic train control technology for the Market Street subway in the SFMTA system and says the award of this contract will ensure seamless integration and interoperability within the SFMTA subway environment.

For more information on companies in this article

Related Content

  • Wireless technology aids workzone communications
    June 7, 2012
    Need for a temporary communication fix during a construction project has led to rapid deployment of a permanent but simplistic wireless broadband network in Chandler, Arizona When a major construction project was expected to disrupt highway communications in the city of Chandler, Arizona, the city’s engineers went looking for a simple solution. They needed a way of maintaining data connections with three consecutive intersections along Arizona Avenue in Chandler while construction necessitated the severin
  • San Francisco bans facial recognition software
    May 15, 2019
    Lawmakers in San Francisco have voted to outlaw the use of facial recognition tools. It is a move which will have implications for police surveillance – and also for transit agencies. It was reported last year that Bay Area Rapid Transit (Bart) was considering the introduction of face recognition software on its cameras, for example – but Bart will not now be able to do so. The 8-to-1 vote by the Board of Supervisors means San Francisco is the first city in the US to take this step – and the decis
  • On the road with France’s dream peddlers
    September 5, 2022
    Connected cycling is becoming more important in France as the way to keep cyclists from giving up their Covid habit of taking two wheels to work and for pleasure
  • San Francisco's Presidio Parkway completed
    July 14, 2015
    The long-awaited Presidio Parkway in San Francisco has opened to traffic. The US$1.1 billion project relied on US$363 million in federal funds, as well as US$152.5 million from the American Recovery and Reinvestment Act, and a US$150 million Transportation Infrastructure Finance and Innovation Act (TIFIA) loan. Since work began in 2009, the Presidio Parkway project replaced Doyle Drive, a 1.6-mile segment of SR-101 linking the city to the Golden Gate Bridge, connecting Marin and San Francisco counties, a