Skip to main content

San Francisco opts for Thales train control

Thales has been awarded a US$24.7 million contract by the San Francisco Municipal Transportation Agency (SFMTA) for the design and construction of advanced train control technology for the new Central Subway project, a 1.7 mile extension of the existing T Line. The company will supply its field-proven SelTrac communications based train control (CBTC) technology for the project, a solution designed to improve transit options for residents in one of the city’s most densely populated neighbourhoods, provide
October 21, 2014 Read time: 2 mins
596 Thales has been awarded a US$24.7 million contract by the 4802 San Francisco Municipal Transportation Agency (SFMTA) for the design and construction of advanced train control technology for the new Central Subway project, a 1.7 mile extension of the existing T Line.

The company will supply its field-proven SelTrac communications based train control (CBTC) technology for the project, a solution designed to improve transit options for residents in one of the city’s most densely populated neighbourhoods, provide a rapid transit link to a burgeoning technology and digital-media hub, and improve access to a premier commercial district and tourist attraction.

For SFMTA, the solution provides maximum performance in terms of headways, passenger throughput and energy conservation. It monitors the position of each train to a high degree of accuracy, which allows faster response times, more tightly controlled movements, and easier expandability and adaptability. In addition, the solution offers the opportunity to lower life-cycle costs and increase revenue by moving more people more quickly. For passengers, the BTC system will result in safe operations and a more predictable commute.

Thales already supplies automatic train control technology for the Market Street subway in the SFMTA system and says the award of this contract will ensure seamless integration and interoperability within the SFMTA subway environment.

For more information on companies in this article

Related Content

  • Smoothing the path to reducing traffic pollution
    October 22, 2014
    David Crawford reviews a new approach to traffic smoothing. A key objective for the Californian city of Bakersfield’s upgraded traffic operations centre (TOC), which opened in June 2014, is to help improve living conditions in a region with one of the worst air quality problems in the US. The TOC is speeding up the smoothing of traffic flows by delivering faster and better-informed traffic signal retiming and synchronisation.
  • North Florida signals coordinated approach to congestion management
    October 7, 2013
    David Crawford investigates innovative congestion management in Florida. The largest US city by area is well into the implementation of an ambitious congestion management system (CMS) on the scale of those of higher-profile centres such as Seattle and San Francisco. Regional agency the North Florida Transportation Planning Organisation (NFTPO) aims to ensure that commuters on major highways in Jacksonville can rely on a minimum 72km/h (45mph) driving speed in normal conditions.
  • Mitsubishi consortium receives letter of conditional acceptance for Doha Metro
    February 23, 2015
    A consortium of Mitsubishi Heavy Industries, Mitsubishi Corporation; Hitachi, The Kinki Sharyo and Thales has received a Letter of Conditional Acceptance from the Qatar Railways Company (Qatar Rail) for a systems package for the Doha Metro, the first metro system to be constructed in the State of Qatar. It is said to be one of the world’s largest projects for a single metro system. Construction is scheduled for completion by October 2019. Qatar Rail is the owner and manager of Qatar’s rail network and respo
  • Indra wins in India with two transport and traffic contracts
    November 30, 2015
    Indra has increased its penetration of the Indian transport and traffic by winning two contracts with a total value of US$12.5 million to deploy its technology in the longest tunnel in Southeast Asia, between Chenani and Nashri, and in the Navi Mumbai metro system, in India's financial capital, both currently under construction. Under the first contract, Indra is responsible for the design, supply, set-up and rollout of the control system for the 9.2 km long tunnel and will equip the control center with