Skip to main content

San Diego rail line gets positive train control

Rail Technology supplier Wabtec is to supply Herzog Technologies to provide with positive train control (PTC) equipment and services for Oceanside, California’s North County Transit District (NCTD) in a deal worth US$9 million. The contract includes an option worth an additional US$5 million. Under the initial contract, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation for seven locomotives and ten passenger transit cab cars on NCTD's Coaster train,
July 24, 2013 Read time: 2 mins
Rail Technology supplier 6079 Wabtec is to supply Herzog Technologies to provide with positive train control (PTC) equipment and services for Oceanside, California’s North County Transit District (NCTD) in a deal worth US$9 million. The contract includes an option worth an additional US$5 million.

Under the initial contract, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation for seven locomotives and ten passenger transit cab cars on NCTD's Coaster train, together with back office engineering and systems integration support.

PTC was mandated by the Rail Safety Improvement Act of 2008 and requires fully functional PTC systems to be in place on trains, such as NCTD's Coaster, by 2015. The NCTD system will be fully interoperable with PTC systems being implemented by Class I railroads.

NCTD is a public transportation agency providing 12 million passenger trips annually on around 60 miles of track throughout North San Diego County and into downtown San Diego.  Its system includes Breeze buses, Coaster commuter trains, Sprinter light rail trains, and Lift paratransit service.  

"We're pleased to be working with Herzog, NCTD and other industry suppliers on this important project," said Albert J Neupaver, Wabtec's chairman and chief executive officer.  "This demonstrates the role we can play, as PTC technology continues to be deployed by other transit agencies around the US over the next several years."

For more information on companies in this article

Related Content

  • I-80 Smart Corridor sets the ITS standard for California's Bay Area
    March 23, 2015
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al
  • TEN-T funds modernise French rail line
    December 10, 2012
    A section of French rail network from Mulhouse to Chalampé on the German border has been inaugurated to passenger traffic as part of a European Union supported project. The TEN-T funded project involves a 17.5 km section of French single-track rail infrastructure; the modernised section, supported by US$903,000 of EU funds, will allow faster connections to and from Mülheim in Germany. The project contributes to the TEN-T Priority Project 24 Lyon/Genova-Basel-Duisburg-Rotterdam/Antwerp railway axis, an esse
  • Adaptive control reduces travel time, cuts congestion
    January 20, 2012
    Situated in San Diego County, California, the growing city of San Marcos has seen its population increase by 53.5 per cent since the turn of the century. Although this dramatic population increase has spurred economic growth bringing new business, homes and opportunities to the city, it has also increased traffic congestion along its central corridor, San Marcos Boulevard. This became the most congested arterial in the city, and, by 2006, the second-most travelled corridor in San Diego County.
  • Aecom awarded Hong Kong tunnel contract
    January 16, 2014
    Aecom Technology Corporation has been awarded a consultancy contract worth around US$13 million for the design and an estimated US$103 million contract for the construction supervision of the Tseung Kwan O to Lam Tin (TKO-LT) tunnel project in Hong Kong. The tunnel will include a 2.6-mile, two-lane highway connecting Tseung Kwan O (TKO) at Po Shun Road in the east with the proposed Trunk Road T2 in Kai Tak development in the west. Along with the Central Kowloon Route and Trunk Road T2, the tunnel wil