Skip to main content

San Diego rail line gets positive train control

Rail Technology supplier Wabtec is to supply Herzog Technologies to provide with positive train control (PTC) equipment and services for Oceanside, California’s North County Transit District (NCTD) in a deal worth US$9 million. The contract includes an option worth an additional US$5 million. Under the initial contract, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation for seven locomotives and ten passenger transit cab cars on NCTD's Coaster train,
July 24, 2013 Read time: 2 mins
Rail Technology supplier 6079 Wabtec is to supply Herzog Technologies to provide with positive train control (PTC) equipment and services for Oceanside, California’s North County Transit District (NCTD) in a deal worth US$9 million. The contract includes an option worth an additional US$5 million.

Under the initial contract, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation for seven locomotives and ten passenger transit cab cars on NCTD's Coaster train, together with back office engineering and systems integration support.

PTC was mandated by the Rail Safety Improvement Act of 2008 and requires fully functional PTC systems to be in place on trains, such as NCTD's Coaster, by 2015. The NCTD system will be fully interoperable with PTC systems being implemented by Class I railroads.

NCTD is a public transportation agency providing 12 million passenger trips annually on around 60 miles of track throughout North San Diego County and into downtown San Diego.  Its system includes Breeze buses, Coaster commuter trains, Sprinter light rail trains, and Lift paratransit service.  

"We're pleased to be working with Herzog, NCTD and other industry suppliers on this important project," said Albert J Neupaver, Wabtec's chairman and chief executive officer.  "This demonstrates the role we can play, as PTC technology continues to be deployed by other transit agencies around the US over the next several years."

Related Content

  • April 5, 2016
    FRA makes funding available for positive train control implementation
    The US Department of Transportation’s Federal Railroad Administration (FRA) is accepting applications for US$25 million in competitive grant funding available to railroads, suppliers, and state and local governments for positive train control (PTC) implementation. The funding is part of the 2016 Consolidated Appropriations Act that funds the US Department of Transportation. Applications will be accepted until 19 May 2016 and FRA will give preference to projects that would provide the greatest level of p
  • January 13, 2014
    Maryland to implement positive train control
    In the wake of the December derailment of a New York passenger train that came off the tracks as it sped too fast into a turn, the Maryland Board of Public Works has approved a US$13 million contract to begin installing positive train control equipment, which uses GPS and radio signalling to react automatically if a collision or derailment is anticipated.
  • April 24, 2014
    California’s MTC expands Cubic Clipper card contract
    California’s Metropolitan Transportation Commission (MTC) has awarded Cubic Transportation Systems a US$7.5 million add-on contract to expand the Clipper card fare payment system to more than a dozen suburban transit agencies in the San Francisco Bay Area. The system, which Cubic delivered and operates, will enhance travel options for commuters in parts of the East and North Bay. Under the updated contract, Cubic will install and configure Clipper fare collection equipment on all East Bay and North Bay o
  • September 7, 2015
    Chicago’s Metra rail system implements PTC
    US systems integrator Parsons has been selected by Metra, Chicago’s commuter rail operator, to install positive train control (PTC) technology on its commuter rail trains. PTC, which is federally mandated, is high tech collision avoidance technology that monitors and controls train movements. It is intended to prevent train to train collisions, over-speed derailments, incursions into established work zones, and movement of trains through a main line switch left in an improper position. As prime contra