Skip to main content

San Bernardino BRT project advancing

McCain has announced the official release of its first round of traffic equipment for the Omnitrans E Street Corridor sbX Bus Rapid Transit (BRT) project in San Bernardino Valley, California. Project materials for release includes traffic signals, traffic signal controllers, traffic controller cabinets, poles, safety lighting, and battery backup systems.
July 26, 2012 Read time: 1 min
772 McCain has announced the official release of its first round of traffic equipment for the Omnitrans E Street Corridor sbX Bus Rapid Transit (BRT) project in San Bernardino Valley, California. Project materials for release includes traffic signals, traffic signal controllers, traffic controller cabinets, poles, safety lighting, and battery backup systems.

A first-of-its-kind project, the Inland Empire intermodal public transit system will include 16 art-inspired platform sites along the 15.7-mile E Street corridor. The state-of-the-art programme will increase transit speed and reliability through the creation of bus-only lanes. Coupled with advanced transit signal priority (TSP), traffic signal timing can be shortened or extended to help buses stay on schedule.

For more information on companies in this article

Related Content

  • GTT and ATC partner on emergency vehicle pre-emption and transit signal priority
    October 12, 2016
    Global Traffic Technologies (GTT) is offering attendees the chance to ride through the streets of Melbourne, to see its Opticom emergency vehicle preemption and transit signal priority solutions in operation. Opticom EVP can streamline a route for first responders by controlling the traffic signals for vehicles and pedestrians, allowing ambulances and other emergency vehicles to navigate congested intersections more effectively. The result is improved response times and a reduction in accidents. Opticom
  • Karachi plans BRT system
    July 17, 2012
    The government of Sindh in Pakistan is planning to implement a bus rapid transit (BRT) system in Karachi and the first phase will cost US$5 million. The system will enable 200 buses to carry around 15,000 passengers an hour and there will be special lanes for buses to operate.
  • Major funding announced to improve Bristol’s public transport
    September 16, 2014
    A new rapid bus network for Bristol will be built after the UK Department for Transport announced US$55 million funding towards the US$73 million total cost of the project. The aim is to provide better bus connections between key areas of employment, housing, retail and leisure. The network will tackle traffic congestion, help create regeneration and support new jobs and homes. The Metrobus is intended to encourage car drivers coming into Bristol to shift onto public transport. Existing bus services i
  • Mounting benefits of dynamic tolling project
    January 30, 2012
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was