Skip to main content

San Bernardino BRT project advancing

McCain has announced the official release of its first round of traffic equipment for the Omnitrans E Street Corridor sbX Bus Rapid Transit (BRT) project in San Bernardino Valley, California. Project materials for release includes traffic signals, traffic signal controllers, traffic controller cabinets, poles, safety lighting, and battery backup systems.
July 26, 2012 Read time: 1 min
772 McCain has announced the official release of its first round of traffic equipment for the Omnitrans E Street Corridor sbX Bus Rapid Transit (BRT) project in San Bernardino Valley, California. Project materials for release includes traffic signals, traffic signal controllers, traffic controller cabinets, poles, safety lighting, and battery backup systems.

A first-of-its-kind project, the Inland Empire intermodal public transit system will include 16 art-inspired platform sites along the 15.7-mile E Street corridor. The state-of-the-art programme will increase transit speed and reliability through the creation of bus-only lanes. Coupled with advanced transit signal priority (TSP), traffic signal timing can be shortened or extended to help buses stay on schedule.

For more information on companies in this article

Related Content

  • QuicNet Pro central control software
    January 31, 2012
    McCain has released a new major version upgrade to the QuicNet Pro 2.0 central control software, an advanced software system that provides traffic control from a central location. It allows entire transportation networks to be monitored and optimised from a single platform and currently operates in over 40,000 intersections worldwide. Enhancements to the latest release include extensive 24/7 data collection and easy-to-read charts, allowing quick identification of trends, resulting in cost reduction and imp
  • Mexico improves road safety with speed enforcement programme
    June 7, 2012
    A programme of road safety education and enforcement in the State of Jalisco in Mexico has reduced speed related fatalities by 40% in nine months Speed enforcement equipment will appear in greater number and visibility around the city of Guadalajara over coming months, as the Mexican State of Jalisco expands its road safety campaign. This comes hot on the heels of an initial programme of traffic speed education and enforcement in Guadalajara, which has yielded remarkable results, reducing speed related fata
  • Grand River Transit expands BRT fleet from New Flyer Canada
    December 22, 2017
    Grand River Transit (GRT) has awarded New Flyer Industries Canada (NFI) with a contract for 39 Xcelsior clean diesel forty-foot, heavy-duty buses, and nine Xcelsior clean diesel forty-foot, bus rapid transit (BRT) heavy-duty buses. The purchase supports scheduled vehicle replacement and has been made through the Public Transit Infrastructure Funds.
  • Canadian JV to build next phase of Ontario BRT
    September 30, 2015
    Metrolinx and York Region Rapid Transit Corporation (YRRTC) today announced the award of a US$248 million contract to the EDCO joint venture to design, build and finance the next phase of the dedicated York Viva Bus Rapid Transit rapidways along the Highway 7 transit corridor Southern Ontario, Canada. This initiative is part of the York Viva BRT project which represents a US$1 billion transit investment from the Government of Ontario and is part of Metrolinx's 25-year Regional Transportation Plan for an