Skip to main content

San Bernardino BRT project advancing

McCain has announced the official release of its first round of traffic equipment for the Omnitrans E Street Corridor sbX Bus Rapid Transit (BRT) project in San Bernardino Valley, California. Project materials for release includes traffic signals, traffic signal controllers, traffic controller cabinets, poles, safety lighting, and battery backup systems.
July 26, 2012 Read time: 1 min
772 McCain has announced the official release of its first round of traffic equipment for the Omnitrans E Street Corridor sbX Bus Rapid Transit (BRT) project in San Bernardino Valley, California. Project materials for release includes traffic signals, traffic signal controllers, traffic controller cabinets, poles, safety lighting, and battery backup systems.

A first-of-its-kind project, the Inland Empire intermodal public transit system will include 16 art-inspired platform sites along the 15.7-mile E Street corridor. The state-of-the-art programme will increase transit speed and reliability through the creation of bus-only lanes. Coupled with advanced transit signal priority (TSP), traffic signal timing can be shortened or extended to help buses stay on schedule.

Related Content

  • May 14, 2014
    McCain scoops San Francisco controller cabinet order
    Known for its high foot-traffic, congested streets and short blocks, the flow of pedestrian traffic plays a major role in San Francisco’s transportation network. Traffic controller maintenance adds to the problem where the cabinets have single front doors that obstruct pedestrian walkways, restricting the flow of foot traffic, and often forcing rerouting and delays. That’s about to change; the City has awarded McCain a contract for the supply of traffic controller cabinets, including the City’s first-ti
  • July 23, 2019
    ADB approves grant for BRT in Karachi
    The Asian Development Bank (ADB) has approved a $235 million loan to help develop a bus rapid transit (BRT) system in Karachi, Pakistan. The project will deliver the 26km Bus Rapid Transit Line Red Line Corridor and associated facilities. More than 300,000 passengers per day are expected on the Red Line BRT routes. It will include the construction of 29 stations and dedicated lanes, a roadway with up to six lanes in each direction, on-street parking and green areas well as the installation of bicycl
  • March 16, 2015
    Report analyses multiple ITS projects to highlight cost and benefits
    Every year in America cost benefit analysis is carried out on dozens of ITS installations and pilot studies and the findings, along with the lessons learned, are entered into the Department of Transportation’s (USDOT’s) web-based ITS Knowledge Resources database. This database holds more than 1,600 reports and periodically the USDOT reviews the material on file to draw conclusions from this wider body of evidence. It has just published one such review ITS Benefits, Costs, and Lessons Learned: 2014 Update Re
  • June 4, 2021
    McCain wins California DMS tech award
    Company is long-term supplier of dynamic message signs to Caltrans