Skip to main content

Russia to spend US$2.3 billion on developing St Petersburg Metro

St Petersburg, Russia anticipates a 1.5 fold increase in subway development financing in 2014, and has allocated around US$2.3 billion in its draft budget for 2014-2016. One of the deepest metro systems in the world, St Petersburg's Metro has a total length of 113.5 km and 67 stations, one of which is 86 metres below ground. Serving 2.15 million passengers daily, it is also one of the busiest metro systems in the world.
September 19, 2013 Read time: 1 min
St Petersburg, Russia anticipates a 1.5 fold increase in subway development financing in 2014, and has allocated around US$2.3 billion in its draft budget for 2014-2016.

One of the deepest metro systems in the world, St Petersburg's Metro has a total length of 113.5 km and 67 stations, one of which is 86 metres below ground. Serving 2.15 million passengers daily, it is also one of the busiest metro systems in the world.

Under the current 2013 budget, US$395 million has been allocated for the construction of new subway stations and the projected budget for 2014-2015 allocates a further US$3.56 billion for new subway stations in 2014.

Related Content

  • May 2, 2018
    Running on empty
    Drivers are an increasingly rare species on Europe’s commuter metros as unattended train operation is embraced. David Crawford takes a low-speed tour of the continent’s capitals to see what’s happening. Unattended train operation (UTO) is fast becoming the norm for Europe’s metros, on existing as well as new lines. November 2017 statistics published by the International Association of Public Transport (UITP) show the continent as having 28% of the global total of route km on lines operating at the ultimate
  • March 10, 2015
    Alstom consortiums awarded contracts for Cairo metro line 3
    Alstom has signed two contracts with Egypt’s National Authority for Tunnels (NAT) to supply the signalling system in a consortium with Thales and, in partnership with Colas Rail, Orascom and ARABCO, the infrastructure of the phase 4A of Cairo metro line 3, currently under construction. Alstom’s shares in these contracts are worth around US$96 million. Cairo’s metro currently carries three million passengers per day and this is expected to reach five million by 2020. Its network includes two fully operationa
  • November 13, 2014
    Colombian highway sees ITS tested to the extreme
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • February 26, 2015
    Kapsch sets course for higher profitability
    Kapsch TrafficCom experienced stable business development in the first three quarters of 2014/2015 with existing installation and operation projects. The Group was also able to obtain a number of new orders in Australia during the third quarter, although new major orders, upon which the innovation and growth plans are based, remained elusive due to the lack of corresponding invitations to tender. Revenue of the Group during the first three quarters of the 2014/15 fiscal year was US$283.5 million, slightly b