Skip to main content

Romanian rail line to be modernised

Romanian state railway company CFR SA has awarded a contract worth US$519 million to a consortium including Strabag for the modernisation of the 42.2 kilometre long railway section between Vințu de Jos and Simeria in western Romania near the city of Sibiu. The modernisation works comprise the renovation of the railway section, including five stations located outside of the densely populated residential areas, rerouting of the track, tunnelling and bridge building as well as the track bed structure. In t
December 6, 2013 Read time: 2 mins
Romanian state railway company CFR SA has awarded a contract worth US$519 million to a consortium including 3861 Strabag for the modernisation of the 42.2 kilometre long railway section between Vințu de Jos and Simeria in western Romania near the city of Sibiu.

The modernisation works comprise the renovation of the railway section, including five stations located outside of the densely populated residential areas, rerouting of the track, tunnelling and bridge building as well as the track bed structure. In total, more than 100 kilometres of track will be laid. Construction is to begin in the spring of 2014 and is scheduled to last 30 months.

Strabag’s portion of the contract is worth at least US$108 million and includes track construction, civil engineering, earth works and road construction.

“The current line, although dual-track and electrified, is in a poor state. The speed of 90-120 km/h is to be raised to 160 km/h after completion of the construction works,” explains Thomas Birtel, CEO of Strabag SE.

For more information on companies in this article

Related Content

  • Fluor to upgrade Red and Purple rail lines in Chicago
    December 20, 2018
    A joint venture team of Fluor and Walsh Construction has been chosen as the preferred partner for phase one of the Red and Purple Line modernisation programme in Chicago. The Chicago Transit Authority is behind the $2.1 billion project, which is expected to improve infrastructure across both lines. The scope of the contract includes the development of new elevated tracks along a 1.9-mile section – featuring new bridges, support structures and existing tracks. Also, 3.2 miles of the signal system will be
  • Skanska awarded Swedish Malar line project
    March 21, 2016
    Skanska has been awarded a contract worth about US$47.96 million by the Swedish Transport Administration for the expansion of Mälarbanan (Malar Line) between Spånga and Barkarby, north of Stockholm. The turnkey project includes the expansion of Mälarbanan from two to four tracks on a three-kilometre section as well as a new platform. Commuter trains will have two separate tracks, while other trains will pass freely on the two outer tracks. Construction start of preparatory work is planned for the su
  • WSP/Parsons Brinckerhoff designing new bridge in Florida
    November 15, 2016
    WSP /Parsons Brinckerhoff will design a new bridge in Pensacola, Florida as part of a design-build team led by Skanska. The project is being undertaken on behalf of the Florida Department of Transportation. The US$398.5 million project includes design and construction of new westbound and eastbound bridges on Route 30 (US 98) to replace the existing three-mile-long bridge that links the communities of Pensacola and Gulf Breeze. The project also includes shared-use paths on the outside of each bridge, rec
  • Mexico’s Durango-Mazatlan highway sets tunnel safety standard
    August 26, 2016
    Mauro Nogarin looks at the management of the longer tunnels on Mexico’s Durango-Mazatlan highway. In recent years the National Infrastructure Fund of Mexico has increased investment in the installation of ITS systems on selected highways to increase road safety. One such major investment is the 230km long Durango-Mazatlan highway which is 12m in width and has an average speed of 110km/h.