Skip to main content

Report finds LED replacement lamps don’t meet criteria

The Lighting Research Center (LRC) at Rensselaer Polytechnic Institute has been conducting evaluations of LED replacement lamps, most recently those with a mogul base. Its report on phase 1 of the project, Mogul based LED replacement lamps, provides details of the market characterisation and pilot photometric testing of 18 representative mogul base LED lamps alone and in luminaires. LRC found that only four of the 18 lamps met the minimum DesignLights Consortium Qualified Products List criteria for retro
January 13, 2015 Read time: 2 mins
The Lighting Research Center (LRC) at Rensselaer Polytechnic Institute has been conducting evaluations of LED replacement lamps, most recently those with a mogul base. Its report on phase 1 of the project, Mogul based LED replacement lamps, provides details of the market characterisation and pilot photometric testing of 18 representative mogul base LED lamps alone and in luminaires.

LRC found that only four of the 18 lamps met the minimum DesignLights Consortium Qualified Products List criteria for retrofit kits when the lamps were placed in area lighting and roadway luminaires. The lamps tested in wall pack and high bay luminaires did not meet the applicable minimum efficacy criteria for retrofit kits.

LRC also conducted a comprehensive survey of specifiers to identify key considerations for lamp selection and relevant luminaire performance characteristics for various lighting applications, such as light output, intensity distribution, size, to support the development of a performance testing plan, the results of which are also included in the report.

Phase 2 is now underway, consisting of additional performance testing of mogul base LED lamps in representative luminaire types. The results of Phase 2 testing will be released as they become available.

The report was funded by the Bonneville Power Administration (BPA) as an assessment of the state of technology development and the potential for emerging technologies to increase the efficiency of electricity use. BPA is undertaking a multi-year effort to identify, assess and develop emerging technologies with significant potential for contributing to efficient use of electric power resources in the Northwest.

“The market is changing so rapidly—and with any new product, it’s important to understand the full range of quality and performance available to consumers,” said John Wilson, Commercial and Industrial Lighting program manager at the Bonneville Power Administration. “This research will help utilities in the Pacific Northwest to make smart and reliable investments in energy efficiency.”

Related Content

  • IBM and NXP partner on Dutch connected car pilot
    February 21, 2013
    The first results of a smarter traffic pilot, conducted in the Dutch city of Eindhoven by IBM and NXP Semiconductors demonstrate how the connected car automatically shares braking, acceleration and location data that can be analysed by the central traffic authority to identify and resolve road network issues, say the companies. “The trial successfully showed that anonymous information from vehicles can be analysed by local traffic authorities to resolve road network issues faster, reduce congestion and impr
  • Study: Consumers do not understand vehicle safety features
    August 14, 2015
    A new study by the University of Iowa found that a majority of drivers expressed uncertainty about how many potentially life-saving vehicle safety technologies work. The survey also showed that 40 per cent of drivers report that their vehicles have acted or behaved in unexpected ways. The study, conducted by the University of Iowa Transportation and Vehicle Safety Research Division, examined drivers' knowledge of vehicle safety systems, as well as their understanding and use of defensive driving techniqu
  • Ground-breaking neutral V2X platform for C-ITS
    June 7, 2021
    Monotch's TLEX can be used by multiple stakeholders across C-ITS ecosystem
  • HeERO - harmonising e-Call across Europe
    March 1, 2013
    The second stage of the EC’s HeERO project, which aims to address some of the issues surrounding the eCall system, has just got underway. Jason Barnes reports. As the European Commission (EC)’s Har­monised eCall European Pilot (HeERO) project progresses into its second stage, ‘HeERO 2’, significant progress has already been made in addressing the technological and institutional issues relating to the pan-European deployment of an eCall system based around the new ‘112’ universal emergency telephone number.