Skip to main content

Report finds LED replacement lamps don’t meet criteria

The Lighting Research Center (LRC) at Rensselaer Polytechnic Institute has been conducting evaluations of LED replacement lamps, most recently those with a mogul base. Its report on phase 1 of the project, Mogul based LED replacement lamps, provides details of the market characterisation and pilot photometric testing of 18 representative mogul base LED lamps alone and in luminaires. LRC found that only four of the 18 lamps met the minimum DesignLights Consortium Qualified Products List criteria for retro
January 13, 2015 Read time: 2 mins
The Lighting Research Center (LRC) at Rensselaer Polytechnic Institute has been conducting evaluations of LED replacement lamps, most recently those with a mogul base. Its report on phase 1 of the project, Mogul based LED replacement lamps, provides details of the market characterisation and pilot photometric testing of 18 representative mogul base LED lamps alone and in luminaires.

LRC found that only four of the 18 lamps met the minimum DesignLights Consortium Qualified Products List criteria for retrofit kits when the lamps were placed in area lighting and roadway luminaires. The lamps tested in wall pack and high bay luminaires did not meet the applicable minimum efficacy criteria for retrofit kits.

LRC also conducted a comprehensive survey of specifiers to identify key considerations for lamp selection and relevant luminaire performance characteristics for various lighting applications, such as light output, intensity distribution, size, to support the development of a performance testing plan, the results of which are also included in the report.

Phase 2 is now underway, consisting of additional performance testing of mogul base LED lamps in representative luminaire types. The results of Phase 2 testing will be released as they become available.

The report was funded by the Bonneville Power Administration (BPA) as an assessment of the state of technology development and the potential for emerging technologies to increase the efficiency of electricity use. BPA is undertaking a multi-year effort to identify, assess and develop emerging technologies with significant potential for contributing to efficient use of electric power resources in the Northwest.

“The market is changing so rapidly—and with any new product, it’s important to understand the full range of quality and performance available to consumers,” said John Wilson, Commercial and Industrial Lighting program manager at the Bonneville Power Administration. “This research will help utilities in the Pacific Northwest to make smart and reliable investments in energy efficiency.”

Related Content

  • DoTs can benefit from high fibre content
    January 14, 2020
    Existing fibre architecture may be one of the most important assets for DoTs going forward: Skyline’s Paul Lennon explains the importance of evaluating ITS network infrastructure maturity
  • Value of time – the key decider
    March 4, 2014
    The ‘value of time’ concept can be a vital decider in prioritising transport projects, as Lorenzo Casullo and Serbjeet Kohli of Steer Davies Gleave explain. How much do travellers value their time and how much would they be willing to pay for a better and faster transport option? For many years Steer Davies Gleave (SDG) has been collecting this type of information from thousands of people across the world as it researches travellers’ behaviour. And given the importance of this parameter for transport mo
  • C/AVs could mean cheaper roads
    October 28, 2019
    The safety benefits of C/AVs have long been promoted – but research suggests they should also contribute to cheaper roads. David Crawford investigates the potential benefits in infrastructure costs Building narrower freeway lanes to accommodate the enhanced route-tracking capabilities of connected and autonomous vehicles (C/AVs), running in platoon conditions, could result in cost savings of £0.5 million (€0.56 million or US$6.5 million) for every km of road length built. Such benefits could be secur
  • Best laid plans
    March 22, 2012
    Colossal is not too bold a word to describe the scale of ITS developments currently under way in Europe. The European Commission’s ITS Action Plan has six areas of focus, each of which expands out into numerous projects involving a lot of leg work by various committees, working groups or consultants. Add to that the supporting work and research efforts of the many parts of Ertico (ITS Europe); plus each of the 27 European Union member states is working on ‘transition’ of the EU’s ITS Directive into their ow