Skip to main content

Report finds LED replacement lamps don’t meet criteria

The Lighting Research Center (LRC) at Rensselaer Polytechnic Institute has been conducting evaluations of LED replacement lamps, most recently those with a mogul base. Its report on phase 1 of the project, Mogul based LED replacement lamps, provides details of the market characterisation and pilot photometric testing of 18 representative mogul base LED lamps alone and in luminaires. LRC found that only four of the 18 lamps met the minimum DesignLights Consortium Qualified Products List criteria for retro
January 13, 2015 Read time: 2 mins
The Lighting Research Center (LRC) at Rensselaer Polytechnic Institute has been conducting evaluations of LED replacement lamps, most recently those with a mogul base. Its report on phase 1 of the project, Mogul based LED replacement lamps, provides details of the market characterisation and pilot photometric testing of 18 representative mogul base LED lamps alone and in luminaires.

LRC found that only four of the 18 lamps met the minimum DesignLights Consortium Qualified Products List criteria for retrofit kits when the lamps were placed in area lighting and roadway luminaires. The lamps tested in wall pack and high bay luminaires did not meet the applicable minimum efficacy criteria for retrofit kits.

LRC also conducted a comprehensive survey of specifiers to identify key considerations for lamp selection and relevant luminaire performance characteristics for various lighting applications, such as light output, intensity distribution, size, to support the development of a performance testing plan, the results of which are also included in the report.

Phase 2 is now underway, consisting of additional performance testing of mogul base LED lamps in representative luminaire types. The results of Phase 2 testing will be released as they become available.

The report was funded by the Bonneville Power Administration (BPA) as an assessment of the state of technology development and the potential for emerging technologies to increase the efficiency of electricity use. BPA is undertaking a multi-year effort to identify, assess and develop emerging technologies with significant potential for contributing to efficient use of electric power resources in the Northwest.

“The market is changing so rapidly—and with any new product, it’s important to understand the full range of quality and performance available to consumers,” said John Wilson, Commercial and Industrial Lighting program manager at the Bonneville Power Administration. “This research will help utilities in the Pacific Northwest to make smart and reliable investments in energy efficiency.”

Related Content

  • Study finds big differences in toll collection cases
    December 16, 2013
    Examination of Norway’s tolling companies finds much to praise, and some criticisms too, as Torill Eidsheim told delegates at the ASECAP conference. The cost of collecting tolls has a substantial effect on the profitability, or otherwise, of tolling companies and is within the company’s control to a far greater degree than, for instance, traffic volumes. And while it is easy to assume that all tolling companies incur similar collection costs, that is not always the case according to Torill Eidsheim, pres
  • Sorting sensible from shiny in tolling technology
    December 11, 2014
    Instead of always striving for the latest shiny toys Kevin Hoeflich of HNTB advises a 10-steps method for selecting the most appropriate technology. Amid the hype and razzmatazz surrounding the launch of Apple’s iPhone 6, the company also announced its new mobile payment system, Apple Pay. Built into the new iPhone 6, Apple Pay works at 220,000 merchants across America and is supported by major US banks and the big three credit card companies.
  • EV market intelligence portal launched
    February 14, 2014
    IDTechEx has launched a new browser-based electric vehicle market intelligence portal which provides companies with real-time global analysis of the total electric vehicles market for land, water and air. The portal is based on an active and continuous program of interviews, data gathering and analysis by PhD-level IDTechEx analysts. Subscription will help clients take a concise and focused approach to accelerate growth and capture opportunities with minimal risk from disruptive technologies. Electri
  • Deadlines approach for Europe’s automatic crash alert system
    September 15, 2016
    The EU-co-funded I_ HeERO (Infrastructure_ Harmonised eCall European Pilot) project is working to ensure the readiness of national networks of call centres - known as public safety answering posts (PSAPs) - to deal with automated crash alerts arriving via the continent-wide 112 emergency phone number. Following on from its HeERO and HeERO2 pre-deployment predecessors, which enjoyed €16m (US$17.76m) in EU funding, the new initiative runs from 1 January 2015 to 31 December 2017. It has €30.9 million (US$34.