Skip to main content

ReachNow installs 20 public EV charging stations in Seattle

BMW’s ReachNow car-sharing service has installed the first of 20 Light & Charge electric vehicle (EV) charging locations in Seattle, US, as part of a US$1.2 million investment by the BMW Group. Seattle is the first city in North America to make the award-winning Light & Charge system, which turns existing streetlights into EV charging stations, available to the public.
May 23, 2017 Read time: 2 mins
BMW’s ReachNow car-sharing service has installed the first of 20 Light & Charge electric vehicle (EV) charging locations in Seattle, US, as part of a US$1.2 million investment by the BMW Group. Seattle is the first city in North America to make the award-winning Light & Charge system, which turns existing streetlights into EV charging stations, available to the public.


The Light & Charge system, developed by BMW together with its partner, eluminocity US, transforms existing street and parking lot light poles into connected nodes on a smart city network. The system combines LED lighting, EV charging and a sensor bus that senses various parameters and connects the site to the cloud. The sensor bus also provides edge-computing power for other connected devices nearby.

In Seattle, each Light & Charge site will include one ChargePoint DC Fast Charger and two to four AC, Level II chargers. The chargers all run on the ChargePoint network and will all be available to the public and compatible with any EV that has a standard SAE J1772 charging port.

The addition of Light & Charge stations in Seattle will also allow ReachNow to expand its shared fleet of EVs. Today, the electric BMW i3 vehicle makes up 10 per cent of the total ReachNow fleet and, with less than a year on the road, ReachNow’s shared electric fleet claims to have saved more than 55 tons of CO2 emissions.

Related Content

  • ABB launches 450kW fast chargers for electric buses, Gothernburg
    November 23, 2017
    ABB has launched a project with Volvo Buses, Västtrafik and Göteborg Energi (GE) to supply two of its 450kW Opportunity Charging systems to charge two high capacity electric-articulated Volvo buses in Gothenburg, Sweden. These fast chargers will be installed at Sahlgrenska University Hospital and Eriksberg Square, on line 16 of the City’s bus network. The order comes after a successful two-year trial under the ElectriCity venture, during which 10 all-electric or partially electrified buses have run on the
  • SP Group expands Singapore EV chargers
    October 10, 2019
    SP Group is expanding its electric vehicle (EV) charger network in Singapore to 200 points, including 52 DC fast chargers. The company says the DC fast chargers will be able to charge an EV in 30 minutes in the Central Business District, Orchard shopping area, the island resort of Sentosa and a planning area in the east region called Paya Lebar. SP is hoping to install 1,000 charging points, of which will be 250 DC chargers by the end of 2020. SP’s head of strategic development, Goh Chee Kiong, sa
  • Evolt wins a place on Scottish EV charging Framework
    June 14, 2016
    Evolt, the electric vehicle (EV) charge point supplier and part of the Swarco group, has been selected by the Energy Saving Trust (EST) as one of the companies to provide EV charging solutions on a new Scotland-wide framework agreement. The new framework includes the right to tender, be selected, or quote for the installation of rapid, commercial and domestic charging units on the mainland and in the Highlands and Islands. The announcement follows a full tender and is effective immediately to an initial
  • Cost benefit analysis ‘can’t be carried out with a cookbook’
    June 25, 2018
    There is far more to working out the worth of a project than simply filling in a few headings on a spreadsheet. David Crawford surveys some recent thinking from the US and Canada. Cost benefit analysis (CBA) “can’t be carried out with a cookbook”, warns US analyst Professor Robert J Brent. “ You can’t just get out a spreadsheet and fill in the data for all the headings. Each transport CBA should have something that is distinctive, in terms of location (for example, for a rural area), types of user