Skip to main content

ReachNow installs 20 public EV charging stations in Seattle

BMW’s ReachNow car-sharing service has installed the first of 20 Light & Charge electric vehicle (EV) charging locations in Seattle, US, as part of a US$1.2 million investment by the BMW Group. Seattle is the first city in North America to make the award-winning Light & Charge system, which turns existing streetlights into EV charging stations, available to the public.
May 23, 2017 Read time: 2 mins
BMW’s ReachNow car-sharing service has installed the first of 20 Light & Charge electric vehicle (EV) charging locations in Seattle, US, as part of a US$1.2 million investment by the BMW Group. Seattle is the first city in North America to make the award-winning Light & Charge system, which turns existing streetlights into EV charging stations, available to the public.


The Light & Charge system, developed by BMW together with its partner, eluminocity US, transforms existing street and parking lot light poles into connected nodes on a smart city network. The system combines LED lighting, EV charging and a sensor bus that senses various parameters and connects the site to the cloud. The sensor bus also provides edge-computing power for other connected devices nearby.

In Seattle, each Light & Charge site will include one ChargePoint DC Fast Charger and two to four AC, Level II chargers. The chargers all run on the ChargePoint network and will all be available to the public and compatible with any EV that has a standard SAE J1772 charging port.

The addition of Light & Charge stations in Seattle will also allow ReachNow to expand its shared fleet of EVs. Today, the electric BMW i3 vehicle makes up 10 per cent of the total ReachNow fleet and, with less than a year on the road, ReachNow’s shared electric fleet claims to have saved more than 55 tons of CO2 emissions.

Related Content

  • Long-distance PoE
    February 2, 2012
    Omnitron Systems Technology has announced a new solution for extending network distances to remote IP security cameras that draw electrical current from Power over Ethernet (PoE). The company's new OmniConverter media converter enables fibre connectivity up to 140km from video servers and network equipment. Installed at end of the fibre run, the device is located near an AC or DC power source, where it converts the fibre to UTP and injects PoE over the cabling to power the IP camera. Classified as Power Sou
  • Use of US public transport increases
    December 19, 2014
    More than 2.7 billion trips were taken on US public transportation in the third quarter of 2014, according to a report released today by the American Public Transportation Association (APTA). This is a 1.8 per cent increase over the same quarter last year, representing an increase of more than 48 million trips and the highest third quarter ridership since 1974 (the oldest third quarter APTA has available for comparison). Some public transit systems that reported record third quarter ridership for their
  • Mexico City seeks solutions to improve air quality
    December 6, 2017
    David Crawford ponders prospects for one of the world’s most congested and polluted cities. In 1992, the United Nations named Mexico City as the world’s most polluted urban centre. In the first half of 2016, following the updating of pollution alert limits to meet international standards, Mexico recorded 115 days where ozone concentrations exceeded the acute exposure health limit.
  • VW scandal prompts emissions testing debate
    December 1, 2015
    In the wake of the VW scandal John Kendall looks at emissions testing on both sides of the Atlantic. Since the VW emissions story broke in September, emissions testing has come under greater scrutiny, and none more so than in Europe, where critics have long been highlighting the weaknesses of the testing system. Ironically, changes to the emissions testing process were already under review but the story has pushed it up the agenda.