Skip to main content

ReachNow installs 20 public EV charging stations in Seattle

BMW’s ReachNow car-sharing service has installed the first of 20 Light & Charge electric vehicle (EV) charging locations in Seattle, US, as part of a US$1.2 million investment by the BMW Group. Seattle is the first city in North America to make the award-winning Light & Charge system, which turns existing streetlights into EV charging stations, available to the public.
May 23, 2017 Read time: 2 mins
BMW’s ReachNow car-sharing service has installed the first of 20 Light & Charge electric vehicle (EV) charging locations in Seattle, US, as part of a US$1.2 million investment by the BMW Group. Seattle is the first city in North America to make the award-winning Light & Charge system, which turns existing streetlights into EV charging stations, available to the public.


The Light & Charge system, developed by BMW together with its partner, eluminocity US, transforms existing street and parking lot light poles into connected nodes on a smart city network. The system combines LED lighting, EV charging and a sensor bus that senses various parameters and connects the site to the cloud. The sensor bus also provides edge-computing power for other connected devices nearby.

In Seattle, each Light & Charge site will include one ChargePoint DC Fast Charger and two to four AC, Level II chargers. The chargers all run on the ChargePoint network and will all be available to the public and compatible with any EV that has a standard SAE J1772 charging port.

The addition of Light & Charge stations in Seattle will also allow ReachNow to expand its shared fleet of EVs. Today, the electric BMW i3 vehicle makes up 10 per cent of the total ReachNow fleet and, with less than a year on the road, ReachNow’s shared electric fleet claims to have saved more than 55 tons of CO2 emissions.

Related Content

  • Roadside infrastructure key to in-vehicle deployment
    November 28, 2013
    The implementation of in-vehicle systems will require multilateral cooperation, as Honda’s Sue Bai explains to Colin Sowman. Vehicle manufacturers will shape the future direction of in-vehicle ITS systems, but they can’t do it on their own. So to find out what they see on the horizon, and the obstacles they face, ITS International spoke to Sue Bai, principal engineer in the Automobile Technology Research Department with Honda R&D Americas. Not only does she play an important role in Honda’s US-based ITS
  • Historic milestone for EVs claimed
    April 17, 2012
    Utah State University Research Foundation's Energy Dynamics Laboratory has announced that it has operated the first high-power, high-efficiency wireless power transfer system capable of transferring enough energy to quickly charge an electric vehicle. The lightweight, low-profile system demonstrated 90 per cent electrical transfer efficiency of five kilowatts over an air gap of 10 inches. The demonstration at EDL's North Logan, Utah, facility further validates that electric vehicles can efficiently be charg
  • Tolling faces up to unprecedented challenge
    October 9, 2020
    The next five years are likely to see a number of changes – but the tolling industry will be equal to them, thinks the IBTTA’s Bill Cramer. The best minds in the business are on the case…
  • Polis x Pride 2022: Mind the queer public transport gap
    June 29, 2022
    Cities are striving to provide inclusive public transport for all. This cannot and will not be achieved without tackling gender and homophobic-based violence across our transit systems. While this is undoubtedly a major undertaking, Polis members — and their peers — are proving real action is possible...