Skip to main content

ReachNow installs 20 public EV charging stations in Seattle

BMW’s ReachNow car-sharing service has installed the first of 20 Light & Charge electric vehicle (EV) charging locations in Seattle, US, as part of a US$1.2 million investment by the BMW Group. Seattle is the first city in North America to make the award-winning Light & Charge system, which turns existing streetlights into EV charging stations, available to the public.
May 23, 2017 Read time: 2 mins
BMW’s ReachNow car-sharing service has installed the first of 20 Light & Charge electric vehicle (EV) charging locations in Seattle, US, as part of a US$1.2 million investment by the BMW Group. Seattle is the first city in North America to make the award-winning Light & Charge system, which turns existing streetlights into EV charging stations, available to the public.


The Light & Charge system, developed by BMW together with its partner, eluminocity US, transforms existing street and parking lot light poles into connected nodes on a smart city network. The system combines LED lighting, EV charging and a sensor bus that senses various parameters and connects the site to the cloud. The sensor bus also provides edge-computing power for other connected devices nearby.

In Seattle, each Light & Charge site will include one ChargePoint DC Fast Charger and two to four AC, Level II chargers. The chargers all run on the ChargePoint network and will all be available to the public and compatible with any EV that has a standard SAE J1772 charging port.

The addition of Light & Charge stations in Seattle will also allow ReachNow to expand its shared fleet of EVs. Today, the electric BMW i3 vehicle makes up 10 per cent of the total ReachNow fleet and, with less than a year on the road, ReachNow’s shared electric fleet claims to have saved more than 55 tons of CO2 emissions.

Related Content

  • Mercedes-Benz to trial electric buses in two German cities
    January 29, 2019
    Mercedes-Benz has supplied three fully-electric buses to German municipal transport company Rhein-Neckar-Verkehr (RNV) to help improve air quality in the cities of Mannheim and Heidelberg. Dr. Peter Kurz, mayor of Mannheim, says: “The electrification of buses is now an important milestone on the way to a clean city and will make local public transport significantly more attractive.” The first eCitaro bus will operate in Heidelberg, travelling from the main train station to the Altstadt commuter rail stati
  • Kyiv Digital: “We never thought we’d create app functionality for missile attacks”
    August 15, 2022
    Russia’s invasion of Ukraine has brought devastating change. Adam Hill reports on how the capital city’s transit app was reconfigured to help citizens stay safe under Russian bombardment – and to record evidence of war crimes
  • 2012 US Urban Mobility Report published
    February 8, 2013
    Researchers at the Texas A&M Transportation Institute (TTI) have come up with a way to measure the unreliability of trip times due to traffic congestion. The Planning Time Index (PTI) illustrates the amount of extra time needed to arrive on time for higher priority events, such as an airline departure, just-in-time shipments, medical appointments or especially important social commitments. If the PTI for a particular trip is 3.00, a traveller would allow sixty minutes for a trip that typically takes twenty
  • ITS America, automakers respond to Rubio-Booker 5.9 GHz spectrum legislation
    June 23, 2014
    The Intelligent Transportation Society of America (ITS America) and US automakers have responded to the announcement on legislation introduced by US Senators Marco Rubio and Cory Booker that would set deadlines on the Federal Communications Commission (FCC) for developing and publishing a test plan for the use of unlicensed devices in the 5.9 GHz band. The senators introduced S. 2505, the Wi-Fi Innovation Act, legislation to expand unlicensed spectrum use by requiring the Federal Communications Commissio