Skip to main content

Rapid transit bus route for Mexico

The first step towards a long-awaited reform of Tijuana’s antiquated and inefficient public transportation system is scheduled to begin early in 2013, with the construction of a 10.5 mile rapid-transit bus route linking the San Ysidro border to the eastern El Florido area of the city. The city is currently served by a disorganised network of buses and taxis. The US$123 million project, known as Ruta Troncal Número 1, is expected to serve more than 120,000 residents a day. Mexico’s federal development bank,
January 2, 2013 Read time: 2 mins
The first step towards a long-awaited reform of Tijuana’s antiquated and inefficient public transportation system is scheduled to begin early in 2013, with the construction of a 10.5 mile rapid-transit bus route linking the San Ysidro border to the eastern El Florido area of the city. The city is currently served by a disorganised network of buses and taxis.

The US$123 million project, known as Ruta Troncal Número 1, is expected to serve more than 120,000 residents a day.  Mexico’s federal development bank, Banobras, is contributing about 30 per cent of the cost and the city of Tijuana paying an equal amount, with the remainder financed by the private sector.

Mayor Carlos Bustamante, who signed the agreement with Banobras in Mexico City, said passengers will save time and money with the new system. The cost of riding on the rapid-transit buses will be about half of the fare for existing routes, he claimed.

The new system “is a modern project, that will dignify the task of transport workers, and bring immediate benefits to Tijuana residents,” commented Bustamante, who has said that improving public transportation would be a priority of his administration.

The new route is being built alongside the Tijuana River channel. There will be no vehicle or pedestrian crossings along the bus route, so transportation “will be safer and faster,” said Roberto Díaz García, head of Tijuana’s municipal property trust. The city is planning fourteen pedestrian bridges and three vehicular bridges in connection with the new route.

One of two bus rapid transit routes planned by the city’s municipal government, work on the first is scheduled to begin in February, and to be completed at the beginning of 2014.

Related Content

  • Wi-Fi win-win for mass transit
    October 31, 2014
    David Crawford explores passenger and operator benefits of on-board Wi-Fi Urban commuters’ growing demand for continuous – and reliable - internet connectivity is spurring network operators into the rapid installation of high-grade Wi-Fi access on their surface and underground networks, as well as in their stations. Such moves are often a key part of strategies to maintain and increase ridership levels.
  • Manchester extends Metrolink tap and go to trams and buses
    March 4, 2025
    UK city will soon have integrated payment in same way as capital London
  • London’s new Cycle Superhighway given the green light
    September 1, 2016
    The Mayor of London, Sadiq Khan, and Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.
  • Sampo Hietanen’s mobility mission
    June 17, 2016
    For a decade Sampo Hietanen harboured a vision of an alternative form of mobility, now as CEO of MaaS Finland he is putting theory into practice. Sampo Hietanen has become the embodiment of Mobility as a Service (MaaS) – a concept he created 10 years ago while working for Finnish civil engineering giant Destia. “I had been working with the mobile sector on traffic information and started thinking what will happen when this becomes bigger,” he says.