Skip to main content

Rapid transit bus route for Mexico

The first step towards a long-awaited reform of Tijuana’s antiquated and inefficient public transportation system is scheduled to begin early in 2013, with the construction of a 10.5 mile rapid-transit bus route linking the San Ysidro border to the eastern El Florido area of the city. The city is currently served by a disorganised network of buses and taxis. The US$123 million project, known as Ruta Troncal Número 1, is expected to serve more than 120,000 residents a day. Mexico’s federal development bank,
January 2, 2013 Read time: 2 mins
The first step towards a long-awaited reform of Tijuana’s antiquated and inefficient public transportation system is scheduled to begin early in 2013, with the construction of a 10.5 mile rapid-transit bus route linking the San Ysidro border to the eastern El Florido area of the city. The city is currently served by a disorganised network of buses and taxis.

The US$123 million project, known as Ruta Troncal Número 1, is expected to serve more than 120,000 residents a day.  Mexico’s federal development bank, Banobras, is contributing about 30 per cent of the cost and the city of Tijuana paying an equal amount, with the remainder financed by the private sector.

Mayor Carlos Bustamante, who signed the agreement with Banobras in Mexico City, said passengers will save time and money with the new system. The cost of riding on the rapid-transit buses will be about half of the fare for existing routes, he claimed.

The new system “is a modern project, that will dignify the task of transport workers, and bring immediate benefits to Tijuana residents,” commented Bustamante, who has said that improving public transportation would be a priority of his administration.

The new route is being built alongside the Tijuana River channel. There will be no vehicle or pedestrian crossings along the bus route, so transportation “will be safer and faster,” said Roberto Díaz García, head of Tijuana’s municipal property trust. The city is planning fourteen pedestrian bridges and three vehicular bridges in connection with the new route.

One of two bus rapid transit routes planned by the city’s municipal government, work on the first is scheduled to begin in February, and to be completed at the beginning of 2014.

Related Content

  • Texas moves to prevent wrong-way drivers
    May 30, 2014
    A study has shown the extent and ramifications of wrong way driving and proposed cost-effective countermeasures. Wrong way driving collisions occur relatively infrequently but the results can be devastating. Statistics from the US National Transportation Safety Board, an independent, federal all-modes agency, reveal that wrong way (WW) driving, account for only about 3% of accidents on high-speed divided highways but are much more likely to result in fatal and serious injuries.
  • Electric bus fleet for Sao Paulo, Brazil
    October 9, 2012
    Mayor of the City of Sao Paulo in Brazil, Gilberto Kassab has announced plans for electric buses from Chinese manufacturer BYD to run in the city by the end of the year. There are approximately 15,000 public buses in the city of Sao Paulo today; however fleet buses are responsible for more than 20% of total transportation emissions. BYD says its electric bus is not only zero-emissions but also economical. It is estimated that energy savings of US$246,000 could be saved during the life cycle of a San Paulo
  • Legal streetfight brews as Trump 'saves' New York from congestion charge
    February 20, 2025
    MTA lawyers challenge USDoT move to shut down Manhattan toll scheme
  • Call for interest issued for Toowoomba Second Range Crossing project
    February 6, 2014
    One of Queensland’s highest priority road infrastructure projects has been secured for the state, with the federal and Queensland governments announcing they will deliver the long-awaited tolled Toowoomba Second Range Crossing (TSRC). Deputy Prime Minister and Minister for Infrastructure and Regional Development Warren Truss called for the private sector to register interest in building the project. He said: “The registration process will move to a formal expression of interest stage over the next cou