Skip to main content

Rapid assembly modular polymer bridge launched

UK companies Arup and Mabey have installed what they say is the world’s first modular glass-fibre, reinforced polymer bridge, with Mabey becoming the first licensed distribution partner. The post-tensioned bridge is designed to be assembled in hard to reach sites where large cranes or heavy machinery cannot be used. Part-funded by the Rail Safety and Standards Board (RSSB) the modular bridge is expected to be of particular interest to the rail industry, providing a safer alternative to level crossings w
March 17, 2017 Read time: 2 mins
UK companies 7942 Arup and Mabey have installed what they say is the world’s first modular glass-fibre, reinforced polymer bridge, with Mabey becoming the first licensed distribution partner.

The post-tensioned bridge is designed to be assembled in hard to reach sites where large cranes or heavy machinery cannot be used. Part-funded by the Rail Safety and Standards Board (RSSB) the modular bridge is expected to be of particular interest to the rail industry, providing a safer alternative to level crossings where traditional pedestrian bridges cannot be installed.

The first bridge has been installed at a Site of Special Scientific Interest for Network Rail in Oxford. The bridge modules were light enough to be transported by an articulated lorry and then assembled on site and lifted from a distance.

Launching as Pedesta, the pre-engineered, modular and fully customisable in its form, material, colour and finish, the bridge features include identical modules, one metre in length, which are fixed together with bolted shear connectors and then post-tensioned.

The system allows spans of up to 30 metres, so it can adapt to suit any application. In addition, being lighter than steel, the modules only require a pallet truck or forklift to move, enabling faster, safer and more efficient project delivery. The material provides additional resistance to fire, graffiti, vandalism, and ultra-violet radiation.

For more information on companies in this article

Related Content

  • Teledyne has eyes on Çanakkale Bridge
    August 17, 2022
    Teledyne Flir’s incident detection cameras cover length of 4.6km Turkish bridge
  • The inside story of how traffic chaos was avoided after I-95 collapse
    August 23, 2023
    June’s collapse of major US roadway I-95 in Pennsylvania could have caused lengthy traffic chaos. But - relatively speaking at least - it didn’t and gridlock was avoided. Alan Dron finds out why
  • The ice man cometh
    August 7, 2018
    Extreme meteorological events have captured global headlines in recent years. Adam Hill talks to Vaisala’s Mark DeVries about what that means for transportation companies trying to keep roads clear. Extreme meteorological events have captured global headlines in recent years. Adam Hill talks to Vaisala’s Mark DeVries about what that means for transportation companies trying to keep roads clear
  • LED road studs aid level crossing safety
    June 16, 2014
    Active LED solar road studs supplied by Rennicks UK have been granted a Certificate of Acceptance by the authority responsible for the UK’s railways, paving the way for the studs to be installed at level crossings around the country. Rennicks say that the road studs are an intuitive signal to pedestrians, cyclists and drivers in the approach to and crossing the track. The studs use dual LEDs with an internal prismatic system for high performance and solar/battery technology for environmental sustaina