Skip to main content

Rapid assembly modular polymer bridge launched

UK companies Arup and Mabey have installed what they say is the world’s first modular glass-fibre, reinforced polymer bridge, with Mabey becoming the first licensed distribution partner. The post-tensioned bridge is designed to be assembled in hard to reach sites where large cranes or heavy machinery cannot be used. Part-funded by the Rail Safety and Standards Board (RSSB) the modular bridge is expected to be of particular interest to the rail industry, providing a safer alternative to level crossings w
March 17, 2017 Read time: 2 mins
UK companies 7942 Arup and Mabey have installed what they say is the world’s first modular glass-fibre, reinforced polymer bridge, with Mabey becoming the first licensed distribution partner.

The post-tensioned bridge is designed to be assembled in hard to reach sites where large cranes or heavy machinery cannot be used. Part-funded by the Rail Safety and Standards Board (RSSB) the modular bridge is expected to be of particular interest to the rail industry, providing a safer alternative to level crossings where traditional pedestrian bridges cannot be installed.

The first bridge has been installed at a Site of Special Scientific Interest for Network Rail in Oxford. The bridge modules were light enough to be transported by an articulated lorry and then assembled on site and lifted from a distance.

Launching as Pedesta, the pre-engineered, modular and fully customisable in its form, material, colour and finish, the bridge features include identical modules, one metre in length, which are fixed together with bolted shear connectors and then post-tensioned.

The system allows spans of up to 30 metres, so it can adapt to suit any application. In addition, being lighter than steel, the modules only require a pallet truck or forklift to move, enabling faster, safer and more efficient project delivery. The material provides additional resistance to fire, graffiti, vandalism, and ultra-violet radiation.

For more information on companies in this article

Related Content

  • Measuring alertness to avert drowsy driver incidents
    December 21, 2015
    Falling asleep at the wheel is the primary cause in thousands of deaths on American and other roads, with truck drivers the most at-risk group. David Crawford investigates measures to counter drowsy driving.
  • IBT goes roundabout in Bradenton, Florida
    May 10, 2019
    Yet another roundabout is being built in the US. The public remains sceptical but agencies and contractors are on board, writes David Arminas Global construction company IBT, based in Miami, has won a contract to install a traffic circle – or roundabout - on State Road 64 near Bradenton, Florida. The deal is part of a road improvement project with the Florida Department of Transportation (DoT). The 13-month project started in November. Worth only $5 million, it is not a big infrastructure contract. But
  • Roadblocker world first
    February 6, 2012
    Following recent crash tests on its HCR4M1200RB in line with the British Standard PAS68, Heald has announced a world first for a test at MIRA.
  • San Diego: Let there be (street)light
    March 30, 2020
    The influence of intelligent streetlights is spreading. David Crawford finds that San Diego’s deployment – and attendant legislation – may offer a blueprint for other cities going forward