Skip to main content

Rail Summit to discuss automated operations in Aviation and Rail, Vienna

The often repeated comparison between the levels of automation in the aviation and rail sectors will come under scrutiny at the Intelligent Rail Summit Vienna 28 – 30 November, according to a report in rail knowledge sharing platform Railtech.com. Dick Terleth, director mobility at ADSE consulting and avionics specialist Sander Van Lochem, will discuss automated operations and focus on the introduction, operation and lifecycle
October 4, 2017 Read time: 2 mins

The often repeated comparison between the levels of automation in the aviation and rail sectors will come under scrutiny at the Intelligent Rail Summit Vienna 28 – 30 November, according to a report in rail knowledge sharing platform Railtech.com.  

Dick Terleth, director mobility at ADSE consulting and avionics specialist Sander Van Lochem, will discuss automated operations and focus on the introduction, operation and lifecycle management of automated train operations. Terleth stated that the main differences is that unlike with rail, in aviation sector there is constant communication between the pilot and ground control but there is no active automated interface between the airplane and traffic control as happens with signalling and control systems in rail.

“This is completely different in the railway sector, where space is more confined to the rail track and a much higher level of interaction between the vehicle and the rail infrastructure takes place. Also, there are more factors, like people walking along the track, to take into consideration. A lot more needs to be done to successfully implement an automated driving system on rail, as the prerequisites are much harder to fulfill,” he added.

Referring to a safety culture developed to the aviation industry, he recognised that it is not as paramount in the rail industry, but a similar focus in inevitable to a successful implementation.  He added that overcoming challenges caused by system malfunctions and acceptance among passengers are two challenges that need to be overcome.

Related Content

  • Russia 2018 World Cup: ITS can win it
    June 5, 2018
    Teams and supporters will cover vast distances in Russia for the 2018 FIFA World Cup. Stephane Clauss from Sony Europe’s Image Sensing Solutions division examines how the latest camera technologies can be deployed to help things run smoothly over the next month or so... For one month, from June 14, Russia is hosting the 2018 FIFA World Cup. This is the largest country in the world and the distances between venues will be larger than at almost any other World Cup - bar the finals in the US and Brazil.
  • Righter shade of pale
    July 24, 2012
    Jon Tarleton, Quixote Transportation Technologies, Inc., talks about developments in mobile weather information gathering Quixote Transportation Technologies, Inc. (QTT) is promoting the greater use of mobile technologies to provide infill between fixed Road Weather Information System (RWIS) infrastructure. It is, the company says, a means of reducing the expense of providing comprehensive, network-wide coverage, particularly in geographic locations where the sheer number of centreline miles causes cost to
  • Transcore challenges perceptions, targets broader markets
    December 13, 2012
    In August this year, Tracy Marks took over the presidency of TransCore, succeeding John Simler, who has moved on to other roles within parent company Roper Industries. A 19-year veteran of the company, Marks describes himself as having been groomed for the job. Previously responsible for TransCore’s Southern region in the US, he also took on a series of roles, including the top job at United Toll Systems, as part of moves which were carefully choreographed to prepare him for where he is now. The appointmen
  • Lorries hitting rail bridges peak in October causing hours of delays and cancellations, Network Rail
    October 26, 2017
    Hundreds of thousands of rail passengers will suffer hours of delays and cancellations this month as figures for oversized lorries hitting low bridges (bridge-strikes) peaked in October/ November to around ten reported incidents every day, according to a new campaign by Network Rail. In addition, there are 2,000 bridge strikes every year costing the taxpayer some £23 million ($30 million) in damages and delays.