Skip to main content

Rail safety technology launched in Central Minnesota

New safety technology being installed along some rail lines across the US, including Central Minnesota, aims to prevent deadly train crashes caused by human error. The technology is designed to automatically stop or slow a train to prevent accidents such as a collision with another train or a derailment caused by excessive speed. The changes stem from federal legislation passed in 2008 after a commuter train collided head-on with a freight train in California, killing twenty-five people and injuring 135. An
January 7, 2013 Read time: 3 mins
New safety technology being installed along some rail lines across the US, including Central Minnesota, aims to prevent deadly train crashes caused by human error. The technology is designed to automatically stop or slow a train to prevent accidents such as a collision with another train or a derailment caused by excessive speed.

The changes stem from federal legislation passed in 2008 after a commuter train collided head-on with a freight train in California, killing twenty-five people and injuring 135. An investigation found the train driver was sending and receiving text messages shortly before the crash.

As a result, congress passed the Rail Safety Improvement Act, requiring positive train control technology to be implemented on all class I passenger lines and freight trains carrying certain hazardous materials by 2015.

Work has already begun to upgrade signals along Burlington Northern Santa Fe’s (BNSF) lines in Minnesota and will continue this year, according to Amy McBeth, a spokeswoman for the railway. BNSF has spent about US$300 million on positive train control upgrades on its entire rail system this year, she said.  “We are on track to meet that required deadline,” McBeth said, continuing “The travelling public probably won’t notice any difference after the technology is installed”.

2008 Amtrak also will install positive train control aboard its trains that run along BNSF rail lines, says Amtrak spokesman Marc Magliari.

6907 Metro Transit, which operates the Northstar commuter rail line between Big Lake and Minneapolis, expects to have its six locomotives and six cab cars outfitted with the equipment in 2014 after the wayside equipment is tested, spokesman John Siqveland said.

Positive train control uses GPS technology to determine a train’s location and speed. It warns train operators of potential problems, then overrides the driver and stops the train if the operator does not respond within a certain amount of time.

The system requires equipment installed along rail lines as well as aboard locomotives. It’s a complex endeavor expected to cost railroads more than US$13 billion to install and maintain over the next twenty years, according to the Association of American Railroads (AAR), which represents major US freight railroads and Amtrak.

According to the AAR, it is not clear whether railroads will meet the 2015 deadline. A report to Congress from the Federal Railroad Administration last August stated that due to significant technical and programmatic issues most railroads are not likely be able to fully implement positive train control by December 2015.

Holly Arthur, a spokeswoman for the AAR, said that, despite best efforts and financial investments, it is becoming clear that meeting the deadline is no longer realistic.  She said that each railroad’s positive train control system is very complex and must operate with other railroads’ systems. “The technology has never been used this way”, she said, “and must be designed, installed and tested before receiving federal certification.  This has never been done before.”

For more information on companies in this article

Related Content

  • Ukraine’s ITS in a time of war
    May 12, 2023
    Following invasion by Russia, work on ITS projects has stopped in Ukraine – but the state road agency and private contractors have pivoted to providing essential services instead
  • Utah commuter rail system upgrades INIT solution
    May 16, 2012
    INIT, Innovations in Transportation, has signed a contract with the Utah Transit Authority (UTA) in Salt Lake City for the installation of an intelligent transportation solution to be fitted on more than 35 FrontRunner commuter rail vehicles. Fifty per cent of the vehicles already have existing automatic passenger counting technology from INIT and will be upgraded with the new system components.
  • Cost of northern Colombia rail line US$1 billion says study
    March 18, 2015
    It would cost nearly US$1 billion to build a 260 kilometre rail line connecting cities in northern Colombia, according to a study by the Universidad del Norte in Barranquilla. The proposed rail corridor would link Santa Marta, Barranquilla and Cartagena, which are home to the three biggest ports on the country's Caribbean coast. The train would function as a mixed service line, transporting passengers as well as cargo. "Some details need to be worked out regarding funding sources, which depends more on the
  • Thales builds on Canadian connection for transit R&D
    June 20, 2016
    The Canadian province of Ontario is continuing to benefit from its ongoing investment in transit R&D. David Crawford looks at the impact of new investment. Developing the next generation of urban rail signalling solutions worldwide, with the emphasis on transit security and efficiency, is the goal of a recently-created business partnership between the government of the Canadian province of Ontario and Thales Canada. The wholly-owned subsidiary of the France-HQ'd global defence, aerospace and transportation