Skip to main content

Rail operator deploys Siemens technology for newly opened light rail line

TriMet's new MAX Orange Line, a light rail project between Portland and Milwaukie in the US incorporates Siemens’ advanced rail technologies, including its S70 light rail vehicles, rail signalling and communication systems and the company's first Sitras SES energy storage unit in the US that uses regenerative braking to sustainably power the line. The 12 kilometre line is the region's sixth construction project of the development project Metropolitan Area Express (MAX) to expand the city's transport net
September 22, 2015 Read time: 2 mins
1272 TriMet's new MAX Orange Line, a light rail project between Portland and Milwaukie in the US incorporates 189 Siemens’ advanced rail technologies, including its S70 light rail vehicles, rail signalling and communication systems and the company's first Sitras SES energy storage unit in the US that uses regenerative braking to sustainably power the line.

The 12 kilometre line is the region's sixth construction project of the development project Metropolitan Area Express (MAX) to expand the city's transport network to cope with expected population growth in the Portland area. The line will improve transit in the corridor that extends from the terminus of the MAX Green and Yellow lines at Portland State University in Downtown Portland to Milwaukie and North Clackamas County.

The newly redesigned light rail vehicles were built based on input from TriMet and passengers and include better sight lines for the driver, more ergonomically designed main cabins and larger displays for train operators so they are better able to monitor the vehicle's status to improve safety and efficiency. Maintenance enhancements were made based on TriMet's feedback including rearrangement of systems to increase accessibility to key components on the vehicles and improved diagnostic systems.

The innovative regenerative rail energy storage technology allows for energy created during braking to be stored and then re-used in one of two forms, energy savings or voltage stabilisation during peak demand times. TriMet will utilise the system in voltage stabilisation mode, which enables the system to avoid disruptions that can occur in mass transit operations if power drops below a certain level. The Sitras SES ensures the system voltage always remains within the required range and voltage-related disruptions no longer occur.

For more information on companies in this article

Related Content

  • £36bn from scrapped HS2 to be spent on 'transport projects' in England
    October 4, 2023
    Money from scaled-back high-speed rail project will be reallocated, insists Rishi Sunak
  • Stepped speed limits improve workzone congestion and safety
    January 30, 2012
    Traffic flow has been improved, congestion eased and safety increased - by a system of 'stepped speed limits' introduced to UK roadworks. URS Scott Wilson principal consultant Jamie Uff reports
  • San Mateo Smart Corridor project
    November 9, 2012
    San Mateo County in California is to implement a US$35 million dollar smart corridor project which will apply the latest management technology along twenty miles of El Camino Real from San Bruno to Menlo Park and on local streets in San Mateo County. “We’re working together to help people get to where they are going easier and faster,” said Caltrans Director Malcolm Dougherty. “This is a good example of how technology can help us make better use of the roads we already have.” The Intelligent Transportation
  • Melbourne metro funding fast-tracked
    February 16, 2015
    Work has begun on one of Australia’s largest infrastructure projects: two nine-kilometre underground rail tunnels that will transform Melbourne’s public transport system. The Victoria government has fast-tracked US$31 million to establish the Melbourne Metro Rail Authority and start work on the project as soon as possible. The project also includes five new underground stations. The Authority will oversee immediate planning works, complete development of the reference design and undertake detailed site inve