Skip to main content

Rail operator deploys Siemens technology for newly opened light rail line

TriMet's new MAX Orange Line, a light rail project between Portland and Milwaukie in the US incorporates Siemens’ advanced rail technologies, including its S70 light rail vehicles, rail signalling and communication systems and the company's first Sitras SES energy storage unit in the US that uses regenerative braking to sustainably power the line. The 12 kilometre line is the region's sixth construction project of the development project Metropolitan Area Express (MAX) to expand the city's transport net
September 22, 2015 Read time: 2 mins
1272 TriMet's new MAX Orange Line, a light rail project between Portland and Milwaukie in the US incorporates 189 Siemens’ advanced rail technologies, including its S70 light rail vehicles, rail signalling and communication systems and the company's first Sitras SES energy storage unit in the US that uses regenerative braking to sustainably power the line.

The 12 kilometre line is the region's sixth construction project of the development project Metropolitan Area Express (MAX) to expand the city's transport network to cope with expected population growth in the Portland area. The line will improve transit in the corridor that extends from the terminus of the MAX Green and Yellow lines at Portland State University in Downtown Portland to Milwaukie and North Clackamas County.

The newly redesigned light rail vehicles were built based on input from TriMet and passengers and include better sight lines for the driver, more ergonomically designed main cabins and larger displays for train operators so they are better able to monitor the vehicle's status to improve safety and efficiency. Maintenance enhancements were made based on TriMet's feedback including rearrangement of systems to increase accessibility to key components on the vehicles and improved diagnostic systems.

The innovative regenerative rail energy storage technology allows for energy created during braking to be stored and then re-used in one of two forms, energy savings or voltage stabilisation during peak demand times. TriMet will utilise the system in voltage stabilisation mode, which enables the system to avoid disruptions that can occur in mass transit operations if power drops below a certain level. The Sitras SES ensures the system voltage always remains within the required range and voltage-related disruptions no longer occur.

For more information on companies in this article

Related Content

  • Positive incentives an alternative to road user charging?
    February 1, 2012
    The Netherlands has been looking at incentivising rush-hour avoidance. The intention is to better understand road users' motivations and find alternatives to congestion charging. Something significant needs to happen if we are to adequately address the traffic congestion and other issues caused by the ever-rising numbers of vehicles on our roads. Congestion or distance-based charging is seen as one way of managing demand and raising revenue for improvements to transport infrastructure. However, charging is
  • Prospects for intercity transport technology
    February 1, 2012
    Magnetic levitation has been dismissed as unproven, too costly, or pie in the sky. It's time to reappraise it. With the unveiling by China (see News section, page 10) of its own, home-grown magnetic levitation train, it would be odd if politicians, policy-makers and the ITS industry did not want to take a closer look at the 'unproven' technology that is magnetic levitation. Fortunately, doing so is easy. The non-profit International Society for Maglev Transportation (The International Maglev Board) has an e
  • Prospects for intercity transport technology
    February 6, 2012
    Magnetic levitation has been dismissed as unproven, too costly, or pie in the sky. It's time to reappraise it
  • Thales Siemens JV wins Spanish high speed rail contract
    August 17, 2015
    Spanish rail administrator Adif has awarded the Thales and Siemens joint venture a US$38.6 million contract to carry out works for the signalling facilities, train protection systems, fixed telecommunications and centralised traffic control for the Chamartín-Torrejón de Velasco section of Spain’s high speed rail network. The project also includes work on the 7.3 km long Atocha-Chamartín tunnel and a maintenance period of 36 months. Siemens Rail Automation will be responsible for modernising the Trackguar